    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN
                                                                                           (40:^ Cardna

    2.           WATER QUANTITY

                  2.1            Rainfall data
                 Historical rainfall intensities were calculated with AUS-IFD software, employing methods
                 detailed in the Institute of Engineers Australia's 1987 Australian Rainfall & Runoff (ARR).
1                The parameters used in the software are listed in Table 1 below.

                 Table 1          Rainfall Parameters for Rockhampton

                   wy uw,nuau nUwnaIuca,,nnnnn,



                               2 year 1 hour   50.0                                   50 year 1 hour   93.64

                              2 year 12 hour   10.69                              50 year 12 hour      23.84

                              2 year 72 hour   3.38                               50 year 72 hour      9.26

                   Geographical Factors

                     Skewness G       0                           F2    4.23                              F50   17.85


                  The AUS-IFD software produces a table of rainfall intensities for a range of storm durations,
                  and this information was entered as a series of design storms to the RAFTS database.
                  Zone 3 temporal patterns were applied to the data according to the ARR standard.

                  2.2            RAFTS Model Setup

                  The site was divided into several subcatchments according to lot position, slope and
                  direction of fall. These are shown schematically on Figure 1 and in plan on Figure 4. In
                  order to mitigate against the potential increase in stormwater runoff following development,
                  the existing situation was also modelled in order to establish a baseline.

                 Slopes in the existing situation were derived from information provided on the surveyor's
                 drawings, and from contours, and slopes for the proposed situation were estimated. These
                 were later adapted to achieve calibration, as described in the following section.

                 Pervious and impervious areas were calculated assuming that the site is completely
                 pervious in its existing state, and completely impervious following development (except for
                 the bioretention strips and landscaping, which are assumed to be completely pervious).
                 The model parameters are listed in Table 2 below.

                 Table 2          RAFTS Model: Area and Slope


                                                        Existing          Proposed              Existing          Proposed
                         Node             Area (ha)
                                                       Slope (%)          Slope (%)             Mannings          Mannings


                      Car park             1.1190           4                     2                0.07             0.025

                   Bioretention            0.1507           4                     2                0.07              0.07

                        Roofs              0.7884           4                  30                  0.07             0.025

                     Hardstand             0.2064           4                     2                0.07             0.025

                     Landscape             0.2011           4                     2               0.07               0.05


                 Each node in RAFTS is also assigned rainfall losses: for pervious areas, initial loss is zero,
                 and continuing loss is 2.5mm. For impervious areas both losses were set to zero.


    Bunnings Warehouse                                       Version 1                                          15 December 2006
    j \3501-54\lAP\SWMP doc                            Commercial in Confidence                                             Page 2

Used in these records

About this file

File size
70.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW11_0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville.pdf · 70.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.