    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN
                                                                                              ^^ Carlla/no

                  2.3            Model Calibration
                 The Rational Method calculation parameters are summarised in Table 3 below.


                 Table 3             Rational Method Calculations

                   Parameter                                   Existing Conditions I Developed Conditions

                   Area                                                                2.7543 ha

                    10 year 1 hour rainfall intensity                                  59 mm/hr

                   Fraction Impervious (fi)                              0.10                              0.775
                   Coefficient of runoff (C10)                           0.55                              0.83

                   Coefficient of runoff (C1oo)                         0.660                              0.996

                   Time of concentration (tc)                          30 mins                            10 mins

                   Rainfall Intensity (100 year)                     152 mm/hr                           249 mm/hr

                    Peak Runoff (100 year ARI)                        0.77 m3/s                          1.90 m3/s

                   % Difference                                                                    Approx + 250 %


                  The model was calibrated by comparing the flows produced by RAFTS with those
                  calculated by the rational method above for the 100 year event. The results are shown
                  below.

                  Table 4            Rational Method vs RAFTS Results

                              Node          Existing Q100 (m3/s)          Proposed Q100 (m3/s)

                         Rational                   0.77                               1.90

                    RAFTS Results                   0.78                               1.82

                        Difference                 +1.3%                              -4.7%


                  As can be seen from the table, the results produced from the Rational calculation for the
                  100-year average recurrence interval compare very favourably in the proposed case with
                  the runoff predicted by the RAFTS model. The results were achieved using a Storage
                  Coefficient Multiplication Factor, B, of 2.

                  2.4            Detention Basin Sizing
                  In order to mitigate the increase in peak discharge under developed conditions the RAFTS
                  model was used to size the detention basin required for the site. The basin will be located
                  in a landscaped area at the south-east corner of the site.

                 The stage storage curves adopted for the basin are presented in Table 5.

                 Table 5             Detention Basins Stage Storage Curves



1                  Stage (m)

                   Storage (m)
                                               0

                                               0
                                                        0.1

                                                        250
                                                                       0.4
                                                                       500
                                                                                      0.6
                                                                                      750     1
                                                                                                   0.8            1.0

                                                                                                  1000 1 1250 1 1500
                                                                                                                             1.2




    Bunnings Warehouse                                           Version 1                                           15 December 2006
    J \3501- 54\WP\SWMP doc                                Commercial in Confidence                                            Page 3

Used in these records

About this file

File size
70.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW11_0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville.pdf · 70.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.