BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN
^^ Carlla/no
2.3 Model Calibration
The Rational Method calculation parameters are summarised in Table 3 below.
Table 3 Rational Method Calculations
Parameter Existing Conditions I Developed Conditions
Area 2.7543 ha
10 year 1 hour rainfall intensity 59 mm/hr
Fraction Impervious (fi) 0.10 0.775
Coefficient of runoff (C10) 0.55 0.83
Coefficient of runoff (C1oo) 0.660 0.996
Time of concentration (tc) 30 mins 10 mins
Rainfall Intensity (100 year) 152 mm/hr 249 mm/hr
Peak Runoff (100 year ARI) 0.77 m3/s 1.90 m3/s
% Difference Approx + 250 %
The model was calibrated by comparing the flows produced by RAFTS with those
calculated by the rational method above for the 100 year event. The results are shown
below.
Table 4 Rational Method vs RAFTS Results
Node Existing Q100 (m3/s) Proposed Q100 (m3/s)
Rational 0.77 1.90
RAFTS Results 0.78 1.82
Difference +1.3% -4.7%
As can be seen from the table, the results produced from the Rational calculation for the
100-year average recurrence interval compare very favourably in the proposed case with
the runoff predicted by the RAFTS model. The results were achieved using a Storage
Coefficient Multiplication Factor, B, of 2.
2.4 Detention Basin Sizing
In order to mitigate the increase in peak discharge under developed conditions the RAFTS
model was used to size the detention basin required for the site. The basin will be located
in a landscaped area at the south-east corner of the site.
The stage storage curves adopted for the basin are presented in Table 5.
Table 5 Detention Basins Stage Storage Curves
1 Stage (m)
Storage (m)
0
0
0.1
250
0.4
500
0.6
750 1
0.8 1.0
1000 1 1250 1 1500
1.2
Bunnings Warehouse Version 1 15 December 2006
J \3501- 54\WP\SWMP doc Commercial in Confidence Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW11/0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road NoosavilleRelated documentApplication case desk ↗
About this file
- File size
- 70.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.