    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                                  111(4^ calw"Cr
                  2.5.1        Areas with impractical gradients

                  It may be noted that levels across the site may be such that it will be difficult or impractical
                  to route runoff from certain areas to the detention basin. To ensure adequate falls across
                  the car park, for example, a cut and fill operation is envisaged which will require the use of
                  a retaining wall along the western boundary. It has been suggested that in this area,

I                 surface water is released direct to the outlet swale without passing through the detention
                  basin (although three-month flows will still pass through bio-retention devices). To ensure
                  that surface water runoff rates following development are equal to or less than those
                  existing, even with an unattenuated area of almost 2500m , the RAFTS model was
                  amended and revised results calculated. The results are shown in Table 7 below.

                  Table 7       Detention Basin Sizing Results - including unattenuated car park area

                     Event     Existing (m'ls)         Stage (m)               Volume (m')    Site Outflow (m3/s)

                       100          0.785                 1.06                    1325              0.575

                        50          0,698                 0.95                    1193              0.522

                        20          0.594                 0.84                    1046              0.471

                        10          0.508                 0.73                    909               0.403

                        5           0.446                 0.66                    822               0.350

                         1          0.224                 0.41                    518               0.209


                  It can be seen that for each storm event, the outflows from the site as a whole (the outflow
                  refers to the site 'end' node and not the basin) remain less than the existing rates.

I                 Paradoxically, allowing certain areas of the site to drain direct to the Swale does not
                  increase the overall peak runoff rate in this case. This is likely to be because the times of
                  concentration (the time taken for the runoff to arrive at the discharge point) for each area do
                  not coincide, and this creates two smaller peaks in the hydrograph over a longer period of
                  time.

                  2.6          Outlet
                  A single 525mm pipe was adopted for the basin outlet and, as described above, set with an
                  invert level 300mm above the bottom of the basin. This outlet pipe will drain through the
                  bund, is 10 metres long and set at a grade of 0.5 per cent. The overflow spillway level was
                  set at 1.15 metres above the invert of the basin (at the downstream end) and is 20 metres
                  wide.

                  The overflow weir becomes operational only in events approaching the 100-year return
                  period, when it would experience a flow depth of approximately 10mm.



r                 As stated, the outlet pipe has been placed with its invert set at 300mm above the 'floor
                  level' of the basin. This provides storage for the containment and stilling of runoff from
                  events of up to the three-month average recurrence interval. These flows will not exit from
                  the basin via the stormwater pipe, but instead through a lower and smaller pipe through a
                  longer period of time. Using this approach, the option also exists to install a sandy loam
                  bioretention filter placed in the floor of the basin to further improve the treatment train.

                  Flows from the detention basin will be released via the outlet to a vegetated Swale, running
                  in a northerly direction along the western boundary of the site. An outline sizing of this
                  Swale is provided in the following section.




    Bunnings Warehouse                                     Version 1                              15 December 2006
    J \3501- 54\VVP\SWMP doc                        Commercial in Confidence                                Page 5

Used in these records

About this file

File size
70.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW11_0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville.pdf · 70.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.