      RUNNINGS WAREHOUSE, NOOSAVILLE
      SURFACE WATER MANAGEMENT PLAN                                                     (L:^ Carldna

                    In order to provide a further improvement in water quality in low flow events (of up to the
                    three month return period) the initial 300mm of storage depth available in the basin will be
                    used for stilling of flows. The main stormwater outlet will be set at 300mm above the basin
                    invert level, whereas a smaller pipe set at a lower level will allow the controlled release of
                    low flows over a longer period.

                    An emergency spillway is also provided in the basin to allow flows from extreme events
                    (including and in excess of the 100-year event) to pass over the rim of the basin, bypassing
r1i
                    the outlet. This weir would be 20 metres wide and at a level of 1.15 metres above the
                    basin invert.

                    2.5              RAFTS Model Results
                    A range of storm durations were modelled for a series of ARI design events. Peak flows
                    were determined for the 1 year through to the 100 year event and durations ranged from
                    10 minutes through to the 24 hour event.

                    The results of the modelling are shown in the table below.

                    Table 6           Detention Basin Sizing Results

                                     Existing Case   Developed Case                     Detention Basin
                       Storm
                                      Discharge      (without basin)       Peak Basin    Peak Basin       Peak Outflow
                       Event
                                         (m'/s)      Discharge (m'/s)       Stage (m)    Volume (m3)         (m'/s)

                         100             0.785            1.816                1.16         1455              0.609

                          50             0.698            1.653                1.06         1321              0.513


I                         20

                          10
                                         0.594
                                         0,508
                                                          1.523

                                                          1.338
                                                                               0.91

                                                                               0.80
                                                                                            1144

                                                                                            1002
                                                                                                              0.451

                                                                                                              0.396

                           5             0.446            1.199                0.72          901              0.351

                           1     I       0.224            0.759                0.46          574              0.198


                    The table shows that in all cases peak outflows are reduced to below the existing case
                    discharges. The maximum utilised volume of the detention basin is approximately 1455 m3,
                    giving a peak stage of 1.16 metres in the 100 year ARI event. It can be noted that the
                    design is relatively conservative as the depth of ponding is relatively low. Therefore it
                    should be possible to optimise the design and reduce the footprint of the basin even further
                    in detailed design.

                    QUDM indicates in Table 6.2 that the maximum allowable stage during the 20 year ARI
                    event is 1.20 metres. The peak basin stage of 0.91 metres displayed for the basin is well
                    below this figure and, of course, the basin is only a maximum of 1.2 metres deep in any
                    case. Further, only the deepest central area of the basin would experience such depths,
                    and the long shallow fall at the edges of the device (set at a gradient of 1 in 6) would
                    preclude any public safety risk due to sharp inclines.

                    To allow for a freeboard and include an additional factor of safety, it is suggested that the
                    top of the bund should be at a level of 300 mm above the maximum 100-year level - in this
                    case equating to 1.46m above the basin invert.




      Bunnings Warehouse                                       Version 1                                  15 December 2006
      J 1.3501-54vM' S`NMP aoc                           Commercial in Confidence                                     Page 4

Used in these records

About this file

File size
70.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW11_0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville.pdf · 70.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.