Council archive · source document
OPW11/0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville
Plans and drawings: the text below has words only, no drawings.
Very large file (70.0 MB): may take a few minutes to open.
RUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN (L:^ Carldna
In order to provide a further improvement in water quality in low flow events (of up to the
three month return period) the initial 300mm of storage depth available in the basin will be
used for stilling of flows. The main stormwater outlet will be set at 300mm above the basin
invert level, whereas a smaller pipe set at a lower level will allow the controlled release of
low flows over a longer period.
An emergency spillway is also provided in the basin to allow flows from extreme events
(including and in excess of the 100-year event) to pass over the rim of the basin, bypassing
r1i
the outlet. This weir would be 20 metres wide and at a level of 1.15 metres above the
basin invert.
2.5 RAFTS Model Results
A range of storm durations were modelled for a series of ARI design events. Peak flows
were determined for the 1 year through to the 100 year event and durations ranged from
10 minutes through to the 24 hour event.
The results of the modelling are shown in the table below.
Table 6 Detention Basin Sizing Results
Existing Case Developed Case Detention Basin
Storm
Discharge (without basin) Peak Basin Peak Basin Peak Outflow
Event
(m'/s) Discharge (m'/s) Stage (m) Volume (m3) (m'/s)
100 0.785 1.816 1.16 1455 0.609
50 0.698 1.653 1.06 1321 0.513
I 20
10
0.594
0,508
1.523
1.338
0.91
0.80
1144
1002
0.451
0.396
5 0.446 1.199 0.72 901 0.351
1 I 0.224 0.759 0.46 574 0.198
The table shows that in all cases peak outflows are reduced to below the existing case
discharges. The maximum utilised volume of the detention basin is approximately 1455 m3,
giving a peak stage of 1.16 metres in the 100 year ARI event. It can be noted that the
design is relatively conservative as the depth of ponding is relatively low. Therefore it
should be possible to optimise the design and reduce the footprint of the basin even further
in detailed design.
QUDM indicates in Table 6.2 that the maximum allowable stage during the 20 year ARI
event is 1.20 metres. The peak basin stage of 0.91 metres displayed for the basin is well
below this figure and, of course, the basin is only a maximum of 1.2 metres deep in any
case. Further, only the deepest central area of the basin would experience such depths,
and the long shallow fall at the edges of the device (set at a gradient of 1 in 6) would
preclude any public safety risk due to sharp inclines.
To allow for a freeboard and include an additional factor of safety, it is suggested that the
top of the bund should be at a level of 300 mm above the maximum 100-year level - in this
case equating to 1.46m above the basin invert.
Bunnings Warehouse Version 1 15 December 2006
J 1.3501-54vM' S`NMP aoc Commercial in Confidence Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW11/0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road NoosavilleRelated documentApplication case desk ↗
About this file
- File size
- 70.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.