1   BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                          (,,^ Cardno

               4.6         MUSIC Methodology
               In order to determine the effectiveness of the proposed treatment train in meeting the water
               quality objectives, a stormwater quality analysis was performed using the Model for Urban
               Stormwater Improvement Conceptualisation (MUSIC) Version 3.01.

               The model requires the user to specify meteorological data (rainfall and evaporation), soil
               properties and pollutant loads for each area of the site, and suitable parameters for the
               MUSIC model were adopted in accordance with the recommendations of the Brisbane City
               Council publication Draft Guidelines for Pollutant Export Modelling in Brisbane- Version 7

t              (2003). The values adopted for the analysis are listed in Appendix A.

               Rainfall and evaporation data for the site was input to the model using ten years of data
               from 1988 to 1997 for Nambour, and employing a six minute time step.

               4.6.1       Adopted Land Uses

               The modelling guidelines define a range of source nodes reflecting various land use types.
               Based on the descriptions, the land use for the proposed site was modelled as
               'commercial'. The existing situation was also modelled for comparison and, due to the
               disturbed nature of the site in its current state, an 'urban residential' node is appropriate.

               The areas of buildings, car parks, bio-retention reserves and landscaped borders were
               derived from site survey and design plans. Roof areas, car parks, roads and associated
               hardstands were assumed to be completely impervious, and the bio-retention reserves and
               landscaped areas assumed to be completely pervious.

               4.6.2       Nursery area

               The nursery area has been assumed to be completely impervious, and is included in the
               model as a 'building'. Rainfall on this area will be intercepted either by the concrete
               hardstand or the shade sails. Although a proportion of incident rainfall will permeate
               through the sails and possibly be intercepted by the plants and their containers, this effect
               has been discounted to enable a conservative quantity assessment.

               Information received from Arterra Landscape Architects and from staff at existing Bunnings
               Warehouses suggests that growing plants would be irrigated at a rate of 20 to 25
               millimetres per week. From the proposals, the growing area has been assumed to be
               equivalent to the area under the shade sails; some 970 m .

               Separate from the main treatment train, the growing area was modelled as a completely
               pervious agricultural node, using a specially prepared rainfall file which simulated the above
               irrigation rate. It was assumed that plants would require irrigation every day for eight
               months, but only every other day for four summer months - a daily rainfall total of 3.6
               millimetres being applied accordingly. Daily pollutant fluxes were exported from this model
               and saved, and applied to the main treatment train model using an 'Imported Data' node.
               The model is shown schematically in Figure 1.

               4.7         Device Sizing
               The vegetated reserves located between the car parking bays will be used to contain the
               main treatment device for the development - a series of long bio-retention devices. The
               car park areas will be graded such that the vast majority of the flow resulting from rainfall
               events of up to the three-month return period will be directed toward the devices. After
               passing through a 500 mm depth of sandy loam filter material, slotted drainage pipes will
               collect the runoff and direct it to the detention basin.



    Bunnings Warehouse                                Version 1                               15 December 2006
    J\3501-54\WP\SWMPdoc                        Commercial in Confidence                              Page 12

Used in these records

About this file

File size
70.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW11_0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville.pdf · 70.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.