     1.0       EXECUTIVE SUMMARY


     TGM Group were engaged by H Troon to prepare the surface water management plan for the
     proposed Bunnings Warehouse development on the corner of Eumundi-Noosa Rd and Gateway Dve,
     Noosaville. We are also required to prepare the runoff quality modelling and design of treatment
     measures to meet the requirements of the MUSIC Modelling Guidelines.

     This report will demonstrate that the minimum runoff quality objectives can be met and exceeded
     by the proposed stormwater treatment and harvesting measures in summary as follows;
F1         •   105kL capacity rainwater tank used for irrigation and toilet flushing,
           •   Bioretention cell with an extended depth of 0.2m and mean area of 308m2,
           •   Buffer Strip equivalent to 23% of an adjacent car park area,

     The following modelling results were achieved using MUSIC:

                                           Source      Residual     Reduction       % Reduction   % Reduction
      Parameter                             Load        Load        Target %       (200mm/hr)*    (5Omm/hr)*
      Flow (ML/yr)                             19.7          16.4                          16.4            4.3
      Total Suspended Solids (kg/yr)      4.10E+03           424              80           89.6           83.3
      Total Phosphorus (kg/yr)                 13.9          2.55             60           81.7           75.7
      Total Nitrogen (kg/yr)                     63          31.1          45  50.7            42.2
      Gross Pollutants (kg/yr.)            456           0          90          100             100
     * Relative results for hydraulic conductivity of 50mm/hour and 200mm/hr for the filter media in
     bioretention cell.




     2.0       WATER QUANTITY


     2.1       Rainfall Data

     The development has not changed location and as such no change to rainfall data is necessary.
     However, for detention basin calculations rainfall hyetographs were used to simulate real rainfall
     events in DRAINS.




                                                         4

Used in these records

About this file

File size
70.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW11_0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville.pdf · 70.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.