     2.2      Runoff Volumes & Flows


I    The site has changed size and layout. The total development site area is approximately 2.32 Ha. The
     development site and amount of impervious area have significantly reduced in size, thus runoff

I    volumes have significantly reduced compared to those calculated by Cardno in the original report.
     The new areas are as follows;




           Surface Type           Original Areas           Proposed Areas (TGM
                                 (Cardno Report)                  Report)

                                         (Ha)                         (Ha)



     Roof                              0,7884                        0.667

     Impervious Ground                  1.325                         1.20
     Surface

     Pervious Areas                     0.352                        0.456

F1
     TGM note that the CARDNO report calculated runoff from the site layout prior to this development
     using RAFTS and it then compared to the result calculated using the rational method. Results of the
     comparison between the RAFTS and rational methodologies indicated that runoff flow rates were
     close and therefore it is expected that a pro-rata adjustment of those flows for the new site areas
     will also give acceptable results (i.e. existing discharge calculations adjusted by a factor of
     2.327Ha/2.7543Ha).




     DRAINS uses rainfall hyetographs from Australian Rainfall & Runoff to simulate actual rainfall events.
     The hyetographs mimic the variation in rainfall during a rain storm, therefore for any given average
     rainfall intensity DRAINS simulates the peaks and troughs during the storm, so that peak runoff flow
     rates may be more than when calculated using the average intensity.

     2.2.1    Detention Basin

     It is anticipated that all paved areas can be collected and discharged via the detention basin and the
     legal point of discharge in Gateway Drive. The construction stage sedimentation basin will be
     cleaned at the end of the construction phase and converted into a detention basin and bioretention
     cell.

t    The outlet pipe from the basin shall be 600mm diameter. The invert of the outlet pipe will be set
     300mm above the invert of the basin to allow for an extended detention period for the
     sedimentation basin. It is assumed that the extended detention depth is full at the commencement
     of the design storms for the purpose of sizing the detention basin.

                                                       5

Used in these records

About this file

File size
70.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW11_0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville.pdf · 70.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.