Skip to the record
Beware of cheap imitations.

Council archive · source document

OPW11/0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville

of 57

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (70.0 MB): may take a few minutes to open.

Log in to see the plans as drawn
 

01

REV:

 

oF

SHEET:

C2

 

 

TGM REF. No.

4400-02-CE

 

     

   

   

 

 

   
  

 

 

  

 

 

   

 

   
        

 

 

  

 

 

 

 

 

 

 

 

               
   
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     
      
  

  
 

   

 

 

 

 

 

 
  
  
 
 
 

  

        
       
    
       

          
  
    
    
      

 

     

 

           
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
    
  
      
   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DATE: DATE:

 

 

 

 

 

 

 

©) COPYRIGHT T.G.M GROUP PTY. LTD.

 

 

 

 

 

 

 

 

 

Web: tgmgroup.com
A.B.N. 11 125 568 461

onas AS/NZS 4801
Environment AS/NZS 14004

 

Fax: (03) 5338 1310
Email: [email protected]

 

NOOSAVILLE, QUEENSLAND

 

 

 

cur INTERNAL DIMENSIONS INLET OUTLET
PITNo. |TYPE} LENGTH WIDTH FROM PIT DIA. (9) INVERT RL DIA. (9) | INVERT RL F.S.L. PIT DEPTH | REMARKS
P01 EW - - P02 4506 RCP 8.59 DETENTION BASIN - = EW TO SUIT 450¢ PIPE
P02 SEP 900 750 PO3 300% RCP RRJ ‘1. 40 450% RCP 13.24 15.35 2.11 MEDIUM DUTY CONCRETE COVER
P03 SEP 900 600 Pod 300% RCP RRJ 14.63 300% RCP RRJ 14.63 16.04 138 MEDIUM DUTY CONCRETE COVER
P05 300% RCP RRJ 14.85
P04 SEP 900 600 Pt 300 ROP RRI Tas 300¢ RCP RRJ 14.85 16.51 1,66 MEDIUM DUTY CONCRETE COVER
| P05 GP 900 600 P06 300% RCP RRJ 15.00 300 RCP RRJ 15.00 16.95 1.95 HEAVY DUTY GRATED COVER
<p 3008 RCP RRJe Aan f P06 GP 900 600 PO7 300% RCP RRJ 15.43 300% RCP RRJ 15.43 16.60 117 HEAVY DUTY GRATED COVER
fo* f P07 GP 900 600 P08 300 RCP RRJ 15.67 300 RCP RRJ 15.67 16.85 1.18 HEAVY DUTY GRATED COVER
KURY / ‘ / |_— 3000 RCP RRJ P08 GP 900 600 P09 300 RCP RRJ 15.96 300 RCP RRJ 15.96 17.25 1.29 HEAVY DUTY GRATED COVER
& BIO RETENTION CELL / 4 fo a P09 GP 900 600 P10 300% RCP RRJ 16.30 300% RCP RRJ 16.30 17.30 1.00 HEAVY DUTY GRATED COVER
“\REFER DETAILS P10 GP 900 600 - - - 300% RCP RRJ 16.51 11.30 0.79 HEAVY DUTY GRATED COVER
y Pil SEP 900 600 - - - 300¢ RCP RRJ 15.90 17.01 111 MEDIUM DUTY CONCRETE COVER
P12 EW - - PB 300% RCP 8.59 DETENTION BASIN - - EW TO SUIT 300¢ PIPE
< P13 SEP 900 750 Pt 300% RCP RRJ 14.19 300% RCP B.03 15.14 2.11 MEDIUM DUTY CONCRETE COVER
D PI4 GP 900 600 PAS 300 RCP RRJ 14.37 300% RCP RRJ 14.37 15.19 0.81 HEAVY DUTY GRATED COVER
it) | P15 SEP 900 600 P16 300 RCP RRJ 44.73 300@ RCP RRJ 14.73 16.05 1,32 MEDIUM DUTY CONCRETE COVER
BREAK INTO SIDE OF EXISTIN P16 SEP 900 600 P17 300 RCP RRJ 15,23 300@ RCP RRJ 15.23 16.29 1.06 MEDIUM DUTY CONCRETE COVER
SIDE ENTRY PIT. aN P17 SEP 900 600 - - - 300 RCP RRJ 15.84 11.19 135 MEDIUM DUTY CONCRETE COVER
HVE} fA \ P18 EW - - P19 525 RCP 8.57 DETENTION BASIN - - EW TO SUIT 5259 PIPE
lo | \ P19 GP 900 750 P20 525% RCP RRJ 9.84 525% RCP 9.84. 11.84 2.00 HEAVY DUTY GRATED COVER
MU I P21 525@ RCP 12.17
(> P20 ap 900 750 525@ RCP RRJ 1h 13.91 2.47 HEAVY DUTY GRATED COVER
= 3009 REP:RRI P27 300 RCP RRJ 12.17
\ OFF % S P21 GP 300 750 P22 525 RCP RRJ 13.24 525 RCP 13.24 14.11 0.87 HEAVY DUTY GRATED COVER
} | YY AVY)
a > » P22 SEP 900 750 P23 525 RCP RRJ 13.78 525% RCP RRJ 13.78 16.11 2.33 MEDIUM DUTY CONCRETE COVER
=~ 4 P23 GP 900 750 P24 4506 RCP RRJ 15.06 525@ RCP RRJ 13.94 16.15 2.21 HEAVY DUTY GRATED COVER
(ZX | i P2k SEP 900 600 P25 300 RCP RRJ 15.44 450@ RCP RRJ 15.44 16.62 1.21 MEDIUM DUTY CONCRETE COVER
' Z | P26 300% RCP RRJ 15.98
P 6 300¢ , ‘ ; T
= | L iS P25 G 900 00 P78 3008 REP RR a RCP RRJ 15.98 16.98 1.00 HEAVY DUTY GRATED COVER
ib, /\ » 3 \ os P26 GP 900 600 - - - 300 RCP RRJ 16.55 17.50 0.95 HEAVY DUTY GRATED COVER
L/ < a } j P27 SEP 900 750 - - - 300% RCP RRJ 13.78 16.01 2.23 MEDIUM DUTY CONCRETE COVER
© | iz PROPOSED BUNNINGS S ie P28 SEP 900 600 - - - 300% RCP 16,09 17.02 0.93 MEDIUM DUTY CONCRETE COVER
Va } FF L 17 50 oo HAS KS P29 EW - - P30 525¢ RCP 8.57 DETENTION BASIN - - EW TO SUIT 525¢ PIPE
ia! _— EBay y P30 JP 900 750 ~ - - 525 RCP 9.01 11.04 2.00 HEAVY DUTY CONCRETE COVER
a SE WW r 3000 RCP RRJ P31 EX SEP EXISTING PIT P32 4506 RCP 8.41 EXISTING PIPE 8.41 11.01 2.60 EXISTING PIT
if P32 EW - - - - - 450 RCP 8.70 - - EW TO SUIT 4509 PIPE
-< ya’ EW - DENOTES ENDWALL
Y P10 SEP - DENOTES SIDE ENTRY PIT
JP - DENOTES JUNCTION PIT
ae GP - DENOTES GRATED PIT
f. Lo Y : —
ry OVERFLOW DISCHARGE LOCATION FROM
TORMWATER HARVESTING TANKS
/ J a rae
Ak LEGEND
___ EXISTING SURFACE CONTOURS
PROPOSED TITLE BOUNDARY
PROPOSED STORMWATER DRAINAGE PIPE
| PROPOSED GRATED PIT
DESIGN PAVEMENT LEVEL
x
HEAVY DUTY ASPHALT PAVEMENT
HEAVY DUTY CONCRETE PAVEMENT
LIGHT DUTY ASPHALT PAVEMENT
PROPOSED ROAD RELOCATIO
REFER EXTERNAL WORKS
DOCUMENTS
REFER EXTERNAL
_ WORKS DOCUMENTS
oom scour smatt
ISSUE ISSUED FOR DATE | DRAWN | APPROVED }ISSUE ISSUED FOR DATE | DRAWN | APPROVED | OFSIGNED: G@ MANSELL DATE: 19/01/11 CLIENT: PROJECT: aa
DRAWN SCALE: CIVIL DRAWING
01 | ISSUED FOR INFORMATION 19/01/11} SM, S. MANTERFIELD 1:500
SURVEY: SHEET SIZE a4 TGM GROUP Pty Ltd BSla H. TROON PTY. LTD. PROPOSED BUNNINGS
Ballarat ALUMINIUM AND STEEL FABRICATORS DRAWING TITLE:
CHECKED: APPROVED:
1315 Sturt Street BUILDERS - COMMERCIAL AND INDUSTRIAL WAREHOUSE
ee Ge vos see PROPOSED INTERNAL DRAINAGE &
Ph: (03) 5330 8888 uns ISO 9004 Tel: (03) 5339 2208 - (03) 5339 3622 EUMUNDI-NOOSA ROAD

PAVEMENT LAYOUT PLAN & PIT SCHEDULE

 

 

TGM REF. No.:

4400-02-CE

SHEET:

 

c2 "3

REV: 0 4

 

 

 

Used in these records

About this file

File size
70.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW11_0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville.pdf · 70.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.