DRAINS ANALYSIS
MAJOR STORMS
DRAINS results prepared 20 January, 2011 from Version 2010.10
PIT / NODE DETAILS Version 8
Name Max HGL Max Pond Max Surface Max Pond Min Overflow Constraint
HGL Flow Arriving Volume Freeboard (cu.m/s)
(cu.m/s) (cu.m) (m)
N6 11.29 1.231
N3 8.14 0
SUB-CATCHMENT DETAILS
Name Max Paved Grassed Paved Grassed Supp. Due to Storm
Flow Q Max Q Max Q Tc Tc Tc
(cu.m/s) (cu.m/s) (cu.m/s) (min) (min) (min)
Catl 1.231 1.143 0.091 15 30 0 AR&R 100 y ear, 20 minutes storm average 185 mm/h, Zone 3
Outflow Volumes for Total Catchment (1.87 impervious + 0.46 pervious = 2.33 total ha)
Storm Total Rainfall Total Runoff Impervious Runoff Pervious Runoff
cu.m cu.m (Runoff %) cu.m (Runoff %) cu.m (Runoff %)
AR&R 20 year, 5 minutes storm, average 253 mm/h, Zone 3 490.61 387.84 (79.1%) 375.74 (95.3%) 12.10 (12.6%)
AR&R 20 year, 10 minutes storm, average 196 mm/h, Zone 3 760.15 627.45 (82.5%) 592.45 (96.9%) 35.00 (23.5%)
AR&R 20 year, 20 minutes storm, average 145 mm/h, Zone 3 1124.72 962.88 (85.6%) 885.56 (97.9%) 77.32 (35.1%)
AR&R 20 year, 30 minutes storm, average 119 mm/h, Zone 3 1384.56 1197.91 (86.5%) 1094.48 (98.3%) 103.43 (38.1%)
AR&R 20 year, 1 hour storm, average 82.7 mm/h, Zone 3 1924.43 1676.76 (87.1%) 1528.53 (98.8%) 148.23 (39.3%)
AR&R 100 year, 5 minutes storm, average 321 mm/h, Zone 3 622.47 507.35 (81.5%) 481.76 (96.3%) 25.59 (21.0%)
AR&R 100 year, 10 minutes storm, average 250 mm/h, Zone 3 969.58 831.30 (85.7%) 760.84 (97.6%) 70.47 (37.1%)
AR&R 100 year, 20 minutes storm, average 185 mm/h, Zone 3 1434.98 1267.90 (88.4%) 1135.02 (98.4%) 132.88 (47,2%)
AR&R 100 year, 30 minutes storm, average 152 mm/h, Zone 3 1768.52 1571.86 (88.9%) 1403.18 (98.7%) 168.68 (48.7%)
AR&R 100 year, 1 hour storm, average 107 mm/h, Zone 3 2489.89 2227.18 (89.4%) 1983.16 (99.1%) 244.02 (50.0%)
AR&R 100 year, 2 hours storm, average 73.5 mm/h, Zone 3 3420.69 3037.21 (88.6%) 2731.53 (99.3%) 305.69 (45.6%)
PIPE DETAILS
Name Max Q Max V Max U/S Max D/S Due to Storm
(cu.m/s) (m/s) HGL (m) HGL (m)
Pipe3 1.231 3 11.295 11.156 AR&R 100 year, 20 minutes storm, average 185 mm/h, Zone 3
Pipet 0.542 6.5 8.935 8.135 AR&R 100 year, 1 hour storm, average 107 mm/h, one 3
CHANNEL DETAILS
Name Max Q Max V Chainage Max Due to Storm
(cu.m/s) (m/s) (m) HGL (m)
DETENTION BASIN DETAILS
Name Max WL MaxVol Max Q Max Q Max Q
Total Low Level High Level
Basing 10.58 1026.2 0.542 0.542 0
CONTINUITY CHECK for AR&R 100 year, 20 minutes storm, average 185 mm/h, Zone 3
Node Inflow Outflow Storage Change Difference
(cu.m) (cu.m) (cu.m) %
N6 1267.9 1267.9 0 01 1
Basing 1267.9 1248 1.25 1.5 1 1
N3 1147.11 1147.11 0 0
20/01/2011 K:\AA - Great Plains Jobs\4400 (Bunnings Noosa)\02 (Civil)\Admin\WSU D\Adm i n\4400-02 (DRAINS Modelling Results)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW11/0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road NoosavilleRelated documentApplication case desk ↗
About this file
- File size
- 70.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.