Council archive · source document
OPW11/0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville
Plans and drawings: the text below has words only, no drawings.
Very large file (70.0 MB): may take a few minutes to open.
Results of hydrologic and hydraulic analysis is included in the table 1 below.
1 Storm Existing
Discharge
Developed Case Detention Basin
Event Discharge (no
(Capacity 1160m3)
detention)
(m3/s)
(m3/s)
Peak Basin Peak Basin Peak Outflow
Stage (m)** Volume (m3)
Tc (Mins) 30 15
100 0.663 1.23 2.1 1030 0.54
20 0.502 0.99 1.7 750 0.45
10 0.429 1.18 1.5 620 0.425
5 0.377 1.03 1.32 550 0.393
** Includes extended detention depth of 0.2m.
Table 1- Detention Basin Requirements
2.2.2 Model Correlation
r Hydrologic and hydraulic computations were performed using DRAINS. DRAINS calculates runoff by
modelling depression (initial) loss for pervious and impervious areas, along with modelling a
reducing loss through infiltration in pervious areas as these areas become wetter (known as the
Horton infiltration model). The following parameter values were used in the hydrologic model;
Paved Area Depression Storage: 1mm
Grassed Area Depression Storage: 3mm
Soil Type: 2 (Moderate infiltration rates)
Antecedent moisture content: 3 (Moderately wet)
6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW11/0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road NoosavilleRelated documentApplication case desk ↗
About this file
- File size
- 70.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.