Council archive · source document
Attachment 4 - Geotech Report · MCU23/0030
50 NOOSA PARADE, NOOSA HEADS PROPOSED RESIDENCE To minimise inflow rates and reduce the risk of external dewatering care must be taken to ensure the temporary shoring wall is ‘water-tight’. Special attention would need given to the detailing such as ensuring secant piles overlap or using interlocking sheet piles as opposed to overlapping sheets which leak. Design for temporary and permanent retaining structures could be carried out using a trapezoidal (for propped walls) pressure distribution applicable to the wall type and based on the parameters listed in Table 3 below. These values do not include allowance for hydrostatic pressures nor transient (e.g. construction) or adjacent footing loadings. The values in Table 3 could also be utilised in assessing lateral earth pressures for the design of the proposed in-ground pool to the north of the site. Table 3: Retaining Structure Design Parameters Lateral earth pressure coefficients Unit Friction Retained material weight angle (t/m3) (Degrees) Ka Ko Kp (Cantilever wall) (Non-yielding wall) Loose Sands 1.7 30 0.33 0.5 3.0 (< 2 m BGL) Medium Dense Sands 1.8 33 0.29 0.46 3.39 (> 2 m) The advice of a specialist contractor must be sought regarding feasibility, design and installation of the preferred retention and dewatering system for this site. It will be necessary to conduct numerical analysis to optimise the retention system. The difficulty and risk associated with managing the basement excavation at this site should not be underestimated. It is recommended that building, retention and dewatering contractors who are well experienced and familiar with such construction in the local area be engaged to undertake the works. 6.3 Building Foundations 6.3.1 Footing Options The feasibility of adopting a high level footing system will depend on the final building levels, earthworks and structure loads. For anticipated working column loads in the order of 1500 kN, and considering the bearing capacity of the foundation soils at basement level, the adoption of individual strip and pad footings for the building is not considered to be practically feasible. Therefore, footing options that may be considered for the residence include a well stiffened raft slab or pile. Discussion on a raft slab and piled footing system is given in Sections 6.3.2 and 6.3.3 respectively. Resistance to uplift from hydrostatic pressures must be addressed (refer Section 6.2 above) by the structural RPEQ. Piles or tie down anchors to resist uplift may be required. Where structures are proposed outside the basement footprint (e.g. outdoor entertaining area), the building would need to be articulated along this junction(s), and the external supported on piles founded in medium dense soils at least 2 m BGL. Screw piles would be a suitable pile type in this circumstance. 6.3.2 Raft Footing Design It is anticipated that a well stiffened raft slab footing system could be adopted to support the proposed building a basement level provided that total and differential settlements can be accommodated. The raft would need to be designed to evenly distribute building loads throughout the slab, including concentrated column loads. For the proposed two storey residence over a single level basement, we estimate a gross distributed load of about 30 kPa (approximately 10 kPa per level) at the foundation level. With a basement excavation depth of about 3 m BGL (below current ground levels), the nett distributed load at foundation 2 February 2023 Report No. 22500-001-Rev0 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4 - Geotech Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.