Council archive · source document
Attachment 4 - Geotech Report · MCU23/0030
50 NOOSA PARADE, NOOSA HEADS PROPOSED RESIDENCE details for control and testing of fill are given in Australian Standard AS 3798-2007 Guidelines on Earthworks for Commercial and Residential Developments. Due to the close proximity of structures on surrounding blocks, care will need to be taken with any activities which may cause excessive ground vibrations (e.g. fill compaction and excavations). It would be prudent to conduct a dilapidation survey of nearby structures before commencement of construction, and to monitor ground vibrations during construction works. When in proximity to settlement sensitive structures or services, only static compaction rolling should be conducted, particularly if excessive vibrations are encountered, and/or to prevent pumping of pore water leading to subgrade heaving/strength loss over the fill platform generally. 6.2 Temporary and Permanent Retention Excavations are expected to be up to about 3 m deep BGL; and given that the planned basement footprint extends close the eastern and western site boundaries (where a two-storey structure on the neighbouring allotment was located), some form of temporary shoring will be required to support the excavation. Shoring methods for the ground conditions encountered could include sheet pile, secant (over-lapping) piles and mud-diaphragm walls. From a cost-benefit perspective, based upon our experience with similar sites in the Noosa coastal area, it is anticipated that sheet piles could be adopted. Depending on the thickness of sheet piles, and other considerations, it may be possible to design for cantilever such that no lateral restraint is required. For a 3 m deep basement excavation, if not designed for cantilever, it is anticipated that lateral restraint may be restricted to internal props or struts in places (as anchors may not be feasible given the proximity to adjacent structures/property boundaries). Along the western boundary where the basement excavation will be close to a neighbouring house, it may be necessary to install a structurally stiffer retention system such as secant piles to mitigate the risk from ground settlement. The advice of a specialist contractor must be sought regarding feasibility, design and installation of the retention system for this site. Sheet pile installation may require pre-drilling to the desired depth due to the presence of dense to very dense sands (including indurated materials) from depths of about 5 m BGL. Care would need to be taken with sheet pile installation to manage potential vibration impacts on nearby structures. It would be prudent to conduct a dilapidation survey of such adjacent structures prior to commencement of the site works. Considering the potential for adverse impacts on nearby structures due to settlement, and potential environmental impacts due to significant dewatering of the groundwater table, external dewatering outside the chosen retention system should be avoided if possible and otherwise managed through a site-specific dewatering management plan prepared by the shoring/dewatering contractor, if necessary. The proposed retention system should be designed to support full hydrostatic pressure. If sheet piles are adopted, subject to detailed design of the basement support system, heavy gauge sheets with an efficient overlap/interlock would be required. To prevent ‘boiling’ of the basement subgrade, the retention system would need to be designed to penetrate to an adequate depth below the basement excavation level such that groundwater flow paths are lengthened, and inflows are minimised. Very dense indurated sand (about 2 m thick) was found at about 7 m BGL in borehole BH1. If this layer is continuous across the site, which is to be confirmed by future investigation works (Ref. Section 6.5 below), and the retention system is toed into it, the indurated sand should act as an aquitard to reduce the amount of groundwater inflow through the base of the excavation such that the impact on the surrounding, external groundwater table would be negligible. Depending on the efficiency of the perimeter cut-off wall, an internal dewatering system (e.g. a series of sand spears or wells connected to an extraction pump) may be required to pick up any seepage that migrates up through the sands across the basement excavation floor. To minimise the volumes of extracted groundwater and the associated treatment requirements, it would be prudent to adjust the depths of internal wells/spears and pumping rates such that the stabilised groundwater level below the excavation floor is optimised (i.e. dewatering is not carried out to an excessive depth, say no more than 1 m deep below the excavation level). 2 February 2023 Report No. 22500-001-Rev0 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4 - Geotech Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.