SUPERCEDED Decision Notice - Approved by Delegation of Authority MCU23 0094, OPW23 0113 & RAL23 0014 [As Published] · MCU23/0094
5. All necessary approvals from external service providers (eg Unitywater) and external parties
on which the development works are proposed have been obtained and a copy supplied to
Council.
6. Copies of the approved plans, duly signed by the consultant Registered Professional
Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer
Construction at the “pre start” meeting.
7. A condition report including photographs of the frontage of the site must be completed and
submitted to council at the prestart meeting.
8. A condition report of the drainage system must be completed for agreement at the prestart
meeting. The condition report is to include a CCTV inspection of the existing pipe and must
include at least 50m upstream and downstream of all works.
9. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
10. Prior to requesting a prestart meeting:
a. Receipt of amended plans approval.
b. Receipt of Fauna management plan.
c. Tree protection fencing must be installed under the supervision of the qualified person*.
(Refer to Advisory Note)
11. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
b. Erosion and sediment control works;
c. Arboreal works.
d. Fauna management works.
e. Other relevant parties
12. A Construction Management Plan must be submitted to Council prior to the pre-start meeting
and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of Uniform Traffic
Control Devices (MUTCD) detailing all temporary signage and traffic control
measures prior to construction.
ii. Maintenance of safe pedestrian access across the frontage of the site both during
daily construction and after daily construction has ceased.
iii. Proposed fencing to the site during the construction phase of the development.
iv. Adequate parking arrangements for construction workers. Note that
Construction Vehicle Parking within the Eumundi Noosa Road Reserve is
unlikely to be supported due to traffic safety and damages to Council and
Department of Transport and Main Roads Property. Any off-site parking
proposal must provide owner’s consent and maintain adequate traffic and
pedestrian safety.
v. No queuing of trucks is permitted on residential streets, especially prior to
7.00am. Further parked trucks must have engines turned off.
b. Maintenance and protection of water quality and existing drainage lines through the
construction site through the implementation of appropriate erosion and sediment
control measures.
Page 15 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERCEDED Decision Notice - Approved by Delegation of Authority MCU23 0094, OPW23 0113 & RAL23 0014 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 245 KB (small file)
- File type
No other editions are linked here.