Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

JUDGEMENT Consent

of 6

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

"Ai

- {
1 APPLICATION DETAILS |

Application No: MCU14/0039 REC15/0012

Street Address: 271) & 305 Lake Macdonald Drive, Lake Macdonald
Real Property Description: Lots 1 & 2 SP 108094

Planning Scheme: The Noosa Plan (16 September 2013)

2 DECISION DETAILS

The following type of approval has| been issued:

. Development Permit for Material Change of Use of Premises - Cultivation Type 2 —
Intensive

. Development Permit for Reconfiguring a Lot (Access Easement)
3 RELEVANT PERIOD OF APPROVAL

The relevant period for this development approval is 4 years starting the day that this
development approval takes effect!
4 CONDITIONS |
Development Permit for Material Change of Use - Cultivation Type 2 - Intensive

(Greenhouse)

PLANNING
When Conditions must be Complied With

1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
within three months of the|date of this approval, and then compliance maintained at all

times while the use continues.
Approved Plans

2. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following table

unless otherwise amended by these conditions.

| Plan No. ' Rev. | |Plan/Document Name | Date

D-01569-06-B | | |Site Plan drawn by Martoo Consulting 23/06/2015

 

8. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation of

excessive noise, lighting nuisance or other emissions.
Building Height

4. The maximum height of the development must not exceed 8 metres above the finished

ground level and the natural ground level.

5. | The use must be undertaken in accordance with the Flood Impact Assessment Version
VO2 dated March 2016 prepared by Water Technology and the Flood Emergency
Management Plan Version VO2 dated March 2016 prepared by Water Technology and
the Water Quality Management Plan dated March 2016. In addition to these plans trash
trap fencing shall be designed to ensure the contents of the greenhouse do not escape

in the event of flooding.

NOOSA COUNCIL

ABN: 97 969.214 121
Log in to download the original file

JUDGEMENT Consent.pdf · 2.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.