Original source · versioned page text
JUDGEMENT Consent
14. 15. 16. Earthworks and Retaining Walls All earthworks must be contained entirely within the site, unless written permission from the affected landowner(s) is provided to Council. Bunds 1 and 2 indicated on the Site Layout Plan drawn by Water Technology and dated 01/07/2015 must be removed within 2 months of this order. If the soil is returned to the source location, it does nat require an Operational Works approval under condition 18. Bund 3 as indicated on |Site Layout Plan drawn by Water Technology and dated 01/07/2015 must be relocated a minimum of 5m away from the root zones of the existing vegetation adjacent the creek. The new bund and area between it and the waterway shall be revegetated with|suitable species and densities in accordance with Planning Scheme Policy 3— Landscaping Plants & Guidelines. Additional Conditions 17. 18. 19. The small dam to the north of the greenhouse structure must be relocated further south and away from riparian vegetation in accordance with the Flood Impact Assessment Version V02 dated March 2016 prepared by Water Technology and the disturbed areas between the relocated dan and the adjacent creek must be revegetated with suitable species and densities in accordance with Planning Scheme Policy 3 — Landscaping Plants and Guidelines. The access works required by condition 8 and the earthworks and landscaping works required by conditions 16|and 17 and any other earthworks carried out in compliance with these conditions including the referenced plans, other than in accordance with condition 15, must be completed in accordance with an Operational Works approval, that must be lodged with Council within 14 days of this approval. Approved works must be completed within two months of the date of that Operational Works approval. Noise emission from mechanical equipment shall comply with the following requirements: 19.1 Air-conditioning, Refrigeration, Pumps, Fans and Generators Oo 7am to 7pm: Background + 5dB(A) ao 7pm to 10pm: Background + 3dB(A) Oo 10pm to 7am: No audible noise. When measured at either the residential boundary or outside the most exposed part of any potentially affected building, whichever is the closest to the equipment. Written certification from al suitably qualified person shall be provided to Council within 2 months of this order that when operating, all such equipment will be compliant with these conditions at all times of day. Damage to Services and Assets 20. Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: a. where the damage} would cause a hazard to pedestrian or vehicle safety, immediately; or b. where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. Development Permit for Reconfiguring a Lot (Access Easement)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.