REV DESCRIPTION DRN DATE
A MCU DA Issue MS 25.02.20
B MCU DA Issue MS 02.03.20
C MCU DA Issue MS 06.03.20
A B
D Client Revisions MS 14.04.20
E MCU DA MS 05.08.20
Information Response
F
I GIA Issue
Variations MS 07.04.21
11.08.21
C -
G GIA Variations MS
C 24.06.21
GENERALLY IN ACCORDANCE
525
H GIA Variations MS 11.08.21
I
Select new roof Glass roof panels fixed onto New Roof New Roof
APPROVED PLAN
New powdercoated
sheeting to existing
roof structure aluminium Heka hood
powdercoated aluminium RHS
sections with double sided tape & "T"
5° 5°
MCU13/.0081.02
Valley gutter
Replace existing screen with new 16 x 40 mm
5360
to manufacturers specification.. Select 17mm glass roof
sheeting to entry walkway only
NOOSA COUNCIL
powdercoated aluminium RHS batten screen,
fully welded to intemediate 40 x 40 RHS
Line of window / wall
under shown dotted
Extend non-combustible
eaves & metal roof
Generally throughout:
existing beach New 'PosiGlaze' balustrade system. Roof 7
13 SEPTEMBER 2021frames
powdercoated aluminium
framing to structural umbrella, stand and End Base channel 75 mm off side -
engineers detail table to be retained walls with stainless steel toprail
New 200 x 50 powdercoated
Beam aluminium awning frame with
Remove existing FC cladding to
powdercoated 'timber-look' New 'PosiGlaze' balustrade system.
Balcony, Party Wall between Building
CBR A & Building B. Check integrity of aluminium battens under to End Base channel 75 mm off side Existing Restaurant
new entry walkway walls with stainless steel toprail
existing wall. Make good all surfaces
BUILDING A BUILDING B
prior to select proprietary-type
FL FL waterproof applied non-combustible
Fall
3°
New 100 x 50 powdercoated New roof over entry /
render & membrane paint system. Screen Screen aluminium pergola frames to exit stair and sanitary
SC-23 SC-22 ground level units facilites respectively
under under
FL
OVF OC OVF OC OC OVF OC
BAL-B3 BAL-B3 BAL-B3 AL Louvre BAL-B3 BAL-B3 BAL-B3 BAL-B4 BAL-B4 BAL-B4 AL Louvre BAL-B4 BAL-B4 BAL-B4
N-RWO GD N-RWO GD GD N-RWO GD GD N-RWO GD
U305 balcony EX-DP EX-DP EX-DP EX-DP EX-DP
U306 balcony U307 balcony U308 balcony U309 balcony U310 balcony GD U311 balcony GDU312 balcony U313 balcony GD U314 balcony GD U315 balcony GD U316 balcony GD
(new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish)
EX-DP EX-DP
EX-DP TL-07 EX-DP EX-DP EX-DP offsets offsets in offsets
fall
F
OV
TL-07 TL-07
TL-07 TL-07 TL-07 in wall wall TL-07 in wall TL-07 TL-07 TL-07 TL-07
fall
fall
fall
fall
fall
fall
fall
fall
fall
fall
fall
TL-07 Ne
OV w
F R
5° oof
CFC
86
r
5
tte
EX-
gu
FL
HYD
ia
sc
Fa
New 200 x 50 powdercoated aluminium awning
FL ter
frame with powdercoated 'timber-look'
ut
xg
aluminium battens under to existing terrace
Ne
bo
w
U305 U306 U307 U308 U309 U310 U311 U312 U313 U314 U315 U316 R
r
3° oof
tte
led
EX-DP in wall
gu
ea
nc
cia
Existing Units
am
Co
fas
Roof 11
Be
(no works)
led
CBR
ea
Check existing conditions to PABX and comms
nc
area. Existing penetrations to be fire-rated as
Co
BAL-B2
per NCC Section C3.15. Provide new panel to
cabling shaft, achieving FRL rating of -/90/90
FL
U304 terrace
(new tiled finish)
OV
ct
F
Du
TL-07
fall
N-RWO Comms. Overflow
Room
Bri lass
s
GD
ck
OV
F
FL
G
TL-07
Glass Glass Glass Glass Glass
Bricks Bricks Bricks Bricks Bricks
FL
EX-DP in wall
BAL-B2
N- Roof 10
RWO CBR
fall
U303 balcony Walkway Ne
(new tiled finish) w
(new tiled finish) R
r
3° oof
tte
U304 TL-07
gu
TL-07 BAL-02 BAL-02 TL-07 TL-07
D
1
cia
fall
L-0
FHR
Void Void Void
BAL-01
BAL-01
BAL-01
BAL-01
fas
Linen
BA
SETOUT POINT
led
BAL-02
GD
ea
EX-DP EX-COL EX-COL EX-COL EX-DP N-DP N-DP
Refuse
nc
EX-COL Suite 2,
Co
EX-DP BAL-01 BAL-01
D
BAL-B2
EX-DP in wall Existing
BAL-02
Existing falls
EX-COL Cnr Gard
Lift Core 01 Walkway
FL
to be maintained
A
TL-07
BAL-02 (new tiled finish) BAL-02 Alexand
U302 balcony
PO Box
O
(new tiled finish) EX-COL EX-COL EX- EX-COL EX-COL N-DP KEX
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans - MCU13-0081.02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.