Skip to the record
The gold standard in government transparency.

Council archive · source document

Delegated Report - Code - Planning OPW23 0120 · OPW23/0120

of 11

Text shows just the words. Original shows the document exactly as it was published.

               The report is provided in accordance with Section 63(5) of the Planning Act 2016.
               RECOMMENDATION
               With regard to Application No OPW23/0120 for a Operational Works - Earthworks, Frontage Work,
               Landscaping, Stormwater, Vehicle Crossover situated at Kingston 23 Edward St Noosaville Qld
               4566 and described as GTP 492, Lot 1 GTP 492, Lot 2 GTP 492, it is recommended the application
               be approved in accordance with the following details for the Decision Notice:
               1.      APPLICATION DETAILS

                   Application No:                  OPW23/0120

                   Street address:                  Kingston 23 Edward St Noosaville Qld 4566

                   Real property description:       GTP 492, Lot 1 GTP 492, Lot 2 GTP 492

                   Planning Scheme:                 Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •       Development Permit for Approval for Operational Works - Earthworks, Frontage Work,
                       Landscaping, Stormwater, Vehicle Crossover
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

               APPROVED PLANS
               1.      Development undertaken in accordance with this approval must generally comply with the
                       approved plans of development. The approved plans are listed in the following table unless
                       otherwise amended by these conditions.

                          Plan No.              Rev.     Plan/Document Name                          Date

                          32091-OW3.1           .        Earthworks Plan                             Sept. 22
                                                         Prepared by SCG Consulting

                          32091-OW4.1           E        Driveway & Access Plan                      Sept. 22
                                                         Prepared by SCG Consulting

                          32091-OW4.2           E        Driveway Levels                             Sept. 22
                                                         Prepared by SCG Consulting

                          32091-SW1.1           B        Stormwater Management Plan                  Sept. 22
                                                         Prepared by SCG Consulting

                          AO3                   A        Landscape    Details,   prepared   by   RG 4 August 2023
                                                         Strategic

                       The following plans require amendment.

                          Plan No.              Rev.      Plan/Document Name                         Date


                                                                                                       Page 4 of 11

Document Set ID: 22566667
Version: 6, Version Date: 03/10/2023

Used in these records

About this file

File size
802 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning OPW23 0120.pdf · 802 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.