Council archive · source document
Delegated Report - Code - Planning OPW23 0120 · OPW23/0120
AO1 A Landscape Plan, prepared by RG Strategic 4 August 2023
AO2 A Legend, prepared by RG Strategic 4 August 2023
Amendments The landscape plans must be resubmitted prior to a prestart meeting
and incorporate the following:
a. Removal of street trees (Buckinghamia celsissima) from
plans.
b. Substitution of the 2 Pandanus planted in the front verge
garden with Cupaniopsis anacardioides.
c. Include additional trees planted at 2.5 metre centres along
the western boundary for privacy screening of neighbours.
d. Provide species and genus of each plant to be utilised.
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 28 September 2025, unless an application to extend the currency
period is approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
3. Prior to requesting a prestart meeting:
a. Receipt of amended plans approval.
Landscaping Works
4. Landscape works must be supervised, undertaken and certified by qualified persons*. All
works must be completed in accordance with this Decision Notice and must include in
particular:
a. the works generally shown on the Approved Plans except where varied by the
conditions of this approval. The landscape plans must be resubmitted prior to a prestart
meeting.
Engineering
5. All necessary approvals from external service providers (e.g., Unitywater) and external
parties on which the development works are proposed have been obtained and a copy
supplied to Council.
6. A condition report including photographs of the frontage of the site must be completed and
submitted to council at the prestart meeting / prior to any works commencing.
7. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
8. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works; and
b. Landscape works.
9. A preliminary Construction Management Plan must be submitted with the Operational Works
application and must address the following:
a. appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
Devices (MUTCD); and
Page 5 of 11
Document Set ID: 22566667
Version: 6, Version Date: 03/10/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW23 0120.pdfRelated documentApplication case desk ↗
About this file
- File size
- 802 KB (small file)
- File type
No other editions are linked here.