01.1 - Geotechnical Report · OPW18/0008
Attached to the e-mail Operational Works Application OPW18/0008 - Domestic Marine Structure at 6 Mermaid Quay NOOSAVILLE.
HRDESIGNGROUP GEOTECHNICAL REPORT CLIENT: RYAN DESIGNER HOMES JOB No.: 17-0417 SITE: LOT 120 CNR SEAMOUNT AND MERMAID QUAYS NOOSA WATERS QLD 4567 AUGUST 1, 2017 HR DESIGN GROUP CROMAR WINNING CONSULTING ENGINEERS PTY LTD T/A Suite 8, 137 Brisbane Road, Mooloolaba QLD 4557
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 11 pages
Page 2
HRDESIGNGROUP Cromar Winning Consulting Engineers Pty LTD T/A ABN30 169 626 957 DESIGN @ROUP Office: Suite 8, 137 Brisbane Road, Mooloolaba QLD 4557 Postal: PO Box 7117, Sippy Downs, QLD 4556 Phone: (07) 5444 5578 Email: [email protected] Web: www.hrdesigngroup.com.au Client: Ryan Designer Homes Job Number: 17-0417 Site: Lot 120 Seamount and Mermaid Quays, Noosa Waters Date Investigated: 42" July 2017 1.0 INTRODUCTION The purpose of this report is to classify the residential site identified above, in accordance with AS2870-2011 - "Residential Slabs and Footings". Boreholes have been drilled in the area of the proposed development to obtain a sample, representative of the surface and sub-surface soil strata for laboratory testing and evaluation of characteristic surface movement. 2.0 SITE DESCRIPTION See the attached report No.11481 by “CSI: Construction Site Investigations”. 3.0 SITE SKETCH See the attached. 4.0 SOIL PROFILE Two (2) boreholes were drilled in the proposed building envelope, positions shown on attached site sketch. The soil profiles are as shown on the attached borelogs by “CSI: Construction Site Investigations’. No water table was encountered during site investigation. The site was found to be filled to 1900mm below test surface level. After examining the fill on site and the results of investigation, it is apparent that an attempt was made to compact the fill under controlled conditions. However as certification is not available to define this fill as “Controlled Fill", we are required by AS2870 to classify this site as Class 'P’. 5.0 SITE CLASSIFICATION Based on the soil profiles encountered during site investigation, and the results of field and laboratory testing, the natural classification of this site is Class 'S'. However, due to the presence of uncontrolled fill which currently exists on this site, we are required by AS2870 to classify this site as Class ‘P’. §.1 Effect Of Earthworks On Site Classification This site classification is based on the soil profile encountered. The extent of further earthworks is unknown. The classification must be reconsidered if the depth of cut varies by more than 300mm or the depth of fill varies by 300mm or exceeds the limits provided in Clauses 2.5.3 and 6.4.2 of AS2870-2011 HRDESIGNGROUP Reference No: 17-0417 Page 7 of 5
Page 3
aa)
DESIGN GROUP <
6.0 RECOMMENDATIONS
Due to the shape and size of the proposed house we recommend that footings are designed based on an appropriate
waffle raft slab deepened with steel screw piers founded in dense natural sands. Alternatively, foundations could be
designed as a conventional stiffened raft slab subject to further geotechnical investigation to confirm the adequacy
and consistency of the existing sand fill.
After the final building platform is created, ensure that positive drainage exists away from the house area. Use a
minimum surface gradient of 1 in 10, or 50mm, away from the footing beams for at least one (1) metre.
Existing or proposed trees shall be kept a minimum distance equal to their mature height away from the footings.
Where rows or groups of trees are involved, the distance from the building should be increased. Root barriers are to
be installed if these trees are likely to affect foundation performance.
Contact this office for full foundation details once house plans are completed.
7.0 QBCC COMPLIANCE
This building site foundation investigation and classification has been undertaken in accordance with AS 2870
“Residential slabs and footings”. The Queensland Building and Construction Commission’s Rectification of Building
Work policy has a requirement for the following information to be supplied to us by the builder, and that we consider
this information in determining the site classification. (Information available at time of classification is indicated by KX]
below)
EX] Information to correctly identify and locate the site;
&X] Contours of the site;
KX Location of existing trees;
LI Overland flow paths;
(J Building footprint and platform level;
( Relevant land search information.
8.0 DRAINAGE
At no time during construction, or after, is water to be permitted to pond in or near footings. Ensure all fill batters away
from the final house, making sure all surface runoff is directed away from the house. (Maximum batters are to be -
1:1.5 for clay soils, and 1:1.7 for sand soils.)
All roof drainage to be discharged either to the street, or into the Local Authority's stormwater system or in accordance
with the Local Authority's requirements.
All external patio, carport and verandah slabs to be graded at not less than 1 in 100 to remove all surface water away
from the house area.
9.0 OWNER’S RESPONSIBILITIES
Stable moisture conditions near the footings, is the responsibility of the owner/occupier of the dwelling. Large changes
in moisture conditions around the structure’s footings, will cause movement, and may lead to damage of the house.
This report must be read in conjunction with the attached report, "Guide to Home Owners on Foundation Maintenance
and Footing Performance", sheet No. 10-91, produced by Dr P.F. Walsh of the CSIRO.
10.0 REPORT LIMITATIONS
Recommendations given in this report are based on the findings of the soil investigation attached. Any change to the
building location may require further investigation and analysis.
Every reasonable effort has been made to locate test sites so that the bores are representative of the soil conditions
within the area of construction. The client should be made aware that exploration is limited by time available and by
HRDESIGNGROUP Reference No: 17-0417 Page 2 of 5
Page 4
a) DESIGN GROUP. economic constraints. If soil conditions differ from those of the log sheet attached during excavation or construction, please notify this office immediately for further inspection and recommendations. The Local Authority and/or property owner/builder should check their records and advise this office of any elements that they are aware could influence the site classification, eg. Cutting and filling of the site. Our definition of rock in this case is the same as the definition in AS2870 “A strong material including shaley material and strongly cemented sand or gravel that does not soften in water. Materials that cannot readily be excavated by a backhoe may be taken to be rock”. Therefore, in our opinion, a backhoe using a 300mm wide bucket will have difficulty in excavating below the depth where we were unable to penetrate. We assume that the backhoe is in good condition and is similar in power to a Case 580 series (or a MF50). In writing this report we have considered all the information supplied to us by our client. Should the client or his agent have omitted to supply us with relevant information, our report may be irrelevant and/or inappropriate. We do not take responsibility for the consequences in such cases, and we will make an additional charge if as a result, more testing or re-writing of the report is necessary. This report has not taken into consideration the long term effect of any previous, current or potential subsurface work by mining companies. At the time of writing this report, neither our client, (or his agent) or the Local Authority had made us aware that surface mining may be affecting this allotment in any way. 11.0 REPORT OWNERSHIP This report has been prepared for the client/s listed at the beginning of the report. Use of this report by any other party is prohibited without the express written permission of HR Design Group. HR Design Group retains the ownership of this report until such time that all outstanding fees and monies have been received at the office of HR Design Group. HR Design Group Cromar Winning Consulting Engineers Pty Ltd T/A Dated: 1 August, 2017. HRDESIGNGROUP Reference No: 17-0417 Page 3 of 5
Page 5
WIND CLASSIFICATION TO AS4055-2012 a Client: Ryan Designer Homes Job Number: 17-0417 Site: Lot 120 Seamount and Mermaid Quays, Noosa Waters The following parameters have been applied to AS 4055 — Wind Loads for Housing, in order to evaluate the design wind classification for the building site. If the building is not a residential house, then AS 4055 does not apply, and the parameters described herein are a guide only to the determination of a design wind velocity and pressures based only upon AS/NZS 1170.2-2011. Building Region: B Terrain Category: Tc3 Topographic Classification: TO Shielding Classification: FS DESIGN WIND CATEGORY: N2 Should you require any more assistance, please do not hesitate to contact my office. HR Design Group Cromar Winning Consulting Engineers Pty Ltd T/A Barry R Cromar B€ng (civil), MiEAust CPEng RPEQ NPER wae ABN Dated: 1 August, 2017. HRDESIGNGROUP Reference No: 17-0417 Page 4 of 5
Page 6
a io DESIGN GROUP APPENDIX e SITE INVESTIGATION REPORT HRDESIGNGROUP Reference No: 17-0417 Page 5 of 5
Page 7
CsI sou TESTING What are you Building on ? SITE INVESTIGATION REPORT Client: HR Design Group HR17-0417 CSI Job No: 11481 Site Address: Lot 120 Cnr Seamount & Mermaid Quays, Noosa Waters Council: Noosa Shire Field Work By: BAC Date of Field Work: 10/07/17 Reported By: BAC Report Date: 12/07/17 In accordance with AS1726-1993 AS2870-2011 CSI: 11484Lot120CnrSeamount&MermaidQuaysNoosaWaters Creabian p/l atf....abn 17108178312 ....PO Box 1128, BUDDINA Q 4575 1300 762 240, 0418 708 636 / 07 5493 5966. [email protected] www.csisoiltesting.com.au
Page 8
CSI sou TESTING What are you Building on ? Site Report CLIENT: HR Design Group HR17-0417 CSI JOB NUMBER: 11481 SITE ADDRESS: Lot 120 Cnr Seamount & Mermaid Quays, Noosa | DATE TESTED: 10/07/17 Waters TESTED BY: BAC TEST METHOD: Hydraulic Rig IN ACCORDANCE WITH AS1726-1993 AS2870-2011 VEGETATION: Well grassed. Medium/large trees near boundaries of adjacent block(s) TOPOGRAPHY: Low lying, filled, alluvial area. Marine clay possible in area. Canal to rear. Fair drainage STRATA SUMMARY: Sand fill over natural alluvial sand CROSS FALL: Approx. level. Embankment at rear, falling to canal. See contour plan WIND RATING: Region B, TC2.5, TO, PS This report does not constitute a slope stability assessment, if the local authority deem it necessary for a slope stability assessment to be done, a specialist Geo-technical engineer will need to be consulted. During and after construction, site drainage must direct all surface, subsurface and roof water away from any construction and toward stormwater run-off areas. It is the owners responsibility to ensure stable moisture conditions around the structure at all times. Guidance can be found in the CSIRO information sheet ‘Guide to Home Owners on Foundation Maintenance and Footing Performance’ or the QBCC booklet ‘Guide to Preventing Structural Damage to your Home’. The design engineer should be aware of the presence of trees on or near the site and that they may have an effect on the performance of the footings/slab, whilst in place and after removal. The design engineer should take ail considerations and satisfy themselves in this regard. Although marine clays were not encountered in this investigation, the design engineer should always be aware of the potential, large or small, of deep seated compressible marine clays in the area. Further in-depth investigation would be required to determine the presence of marine clays. This report is based on site information as at the time of investigation. A borehole sample is a very small snapshot of the whole site volume and soil conditions can change over the site. If after excavation of the site footings, the soil profile is significantly different to that indicated on the attached borelogs, or if the house is situated in a different location as that marked on the site sketch or if any material change has occurred to the site, this report will become void. This office is to be notified of such occurrences, so as a new investigation can be carried out (further charges will apply). Reported by B.A.Croke Assoc Dip Civil Eng QBCC Site Classifiers Lic No. 1064963 CSI: 14481Lott20CnrSeamount&MermaidQuaysNoosaWaters Creabian p/l atf....abn 17108178312 ....PO Box 1128, BUDDINA Q 4575 1300 762 240, 0418 708 636 / 07 5493 5966. [email protected] www.csisoiltesting.com.au
Page 9
_€SI ‘sou TESTING
What are you Building on ?
Field Investigation Data
age oeath dcp (BH) Borehole No.1 Comments
{m)
2 01 . 7 : . .
2 0.2 0.0 Silty SAND (SM), fine to medium grained, dark grey, moist, medium dense (FILL)
4 0.3
6 0.4 0.4 Silty SAND (SM), fine to medium grained, yellow brown, moist, dense (FILL)
9 0.5
5 ae 1.6 Silty SAND (SM), fine to medium grained, dark grey, wet, medium dense
4 ps 2.0 SAND (SP), fine to medium grained, light grey, wet, dense
9 1.0 .
9 44 6.0 Terminated
8 1.2
5 1,3
4 14
3 1.5
3 1.6
3 17
7 1.8
10 1.9
1 2.0
11 2.1
12 2.2
7 23
8 24
15 2.5
15 2.6
13 27
10 2.8
8 2.9
3.0
oF | death | OOP (BH) Borehole No.2 Comments
(m)
1 0.1
3 02 0.0 Silty SAND (SM), fine to medium grained, dark grey, moist, medium dense (FILL)
5 0.3
4 0.4 0.3 Silty SAND (SM), fine to medium grained, brown, moist, dense (FILL)
8 0.5
10 aS 0.7 Silty SAND (SM), fine to medium grained, yellow brown, moist, dense (FILL)
ie 08 1.9 Silty SAND (SM), fine to medium grained, grey, wet, medium dense
14 1.0
419 14 2.5 SAND (SP), fine to medium grained, light grey, wet, dense
16 1.2
14 1.3 7.0 Terminated
14 1.4
10 1.5
5 1.6
6 V7
3 1.8
2 1.9
2 2.0
1 2.1
1 2.2
a 2.3
5 24
8 2.5
10 2.6
7 2.7
7 2.8
7 29
3.0
CSI: 11481tLoti20CnrSeamount&MermaidQuaysNoosaWaters
Creabian p/i atf....abn 17108178312 ....PO Box 1128, BUDDINA Q 4575
1300 762 240, 0418 708 636 / 07 5493 5966. [email protected] www. csisoiltesting.com.au
Page 10
60/2 ager | soisza auwNiiunaue PID aug selon ten, uayemeroon | > Sein Zoey oat sem TBE | yy Sretoemerrwgt orem tans cate Sow wore | aenpwuneweasartiot | \,4/ vw acanezt lara ang patodaag Aad st Auedeyy | ewWS}9) spmmeeeioeouren nme -apeeretame aren besos ~uaamgmeemmsiiars meccmemeen| Le te Boe Sara Se sl seus] wtameneaf ae Rnterpemenst afte pucmaune nap acren ig nett a ee ecctanen por comaigar eH Ne PANS MPN Ne
Page 11
csi sou TESTING What are you Building on ? Photos CSI: 11481Lot120CnrSeamount&MermaidQuaysNoosaWaters Creabian pAl alf....abn 17108178312 ....PO Box 1128, BUDDINA Q 4575 1300 762 240, 0418 708 636 / 07 5493 5966. [email protected] www. csisoiltesting.com.au
Page 12
CSI sou TESTING What are you Building on ? CSE 11481Lot120CnrSeamount&MermaidQuaysNoosaWaters Creabian pA atf....abn 17108178312 ....PO Box 1128, BUDDINA Q 4575 1300 762 240, 0418 708 636 / 07 5493 5966. [email protected] www.csisoiltesting.com.au
Used in these records
01.1 - Geotechnical Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.