Council archive · source document
01.1 - Geotechnical Report · OPW18/0008
Attached to the e-mail Operational Works Application OPW18/0008 - Domestic Marine Structure at 6 Mermaid Quay NOOSAVILLE.
HRDESIGNGROUP Cromar Winning Consulting Engineers Pty LTD T/A ABN30 169 626 957 DESIGN @ROUP Office: Suite 8, 137 Brisbane Road, Mooloolaba QLD 4557 Postal: PO Box 7117, Sippy Downs, QLD 4556 Phone: (07) 5444 5578 Email: [email protected] Web: www.hrdesigngroup.com.au Client: Ryan Designer Homes Job Number: 17-0417 Site: Lot 120 Seamount and Mermaid Quays, Noosa Waters Date Investigated: 42" July 2017 1.0 INTRODUCTION The purpose of this report is to classify the residential site identified above, in accordance with AS2870-2011 - "Residential Slabs and Footings". Boreholes have been drilled in the area of the proposed development to obtain a sample, representative of the surface and sub-surface soil strata for laboratory testing and evaluation of characteristic surface movement. 2.0 SITE DESCRIPTION See the attached report No.11481 by “CSI: Construction Site Investigations”. 3.0 SITE SKETCH See the attached. 4.0 SOIL PROFILE Two (2) boreholes were drilled in the proposed building envelope, positions shown on attached site sketch. The soil profiles are as shown on the attached borelogs by “CSI: Construction Site Investigations’. No water table was encountered during site investigation. The site was found to be filled to 1900mm below test surface level. After examining the fill on site and the results of investigation, it is apparent that an attempt was made to compact the fill under controlled conditions. However as certification is not available to define this fill as “Controlled Fill", we are required by AS2870 to classify this site as Class 'P’. 5.0 SITE CLASSIFICATION Based on the soil profiles encountered during site investigation, and the results of field and laboratory testing, the natural classification of this site is Class 'S'. However, due to the presence of uncontrolled fill which currently exists on this site, we are required by AS2870 to classify this site as Class ‘P’. §.1 Effect Of Earthworks On Site Classification This site classification is based on the soil profile encountered. The extent of further earthworks is unknown. The classification must be reconsidered if the depth of cut varies by more than 300mm or the depth of fill varies by 300mm or exceeds the limits provided in Clauses 2.5.3 and 6.4.2 of AS2870-2011 HRDESIGNGROUP Reference No: 17-0417 Page 7 of 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
01.1 - Geotechnical Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.