INTEGRATED PLANNING ACT 1997 IDAS Assessment Checktist, Version 20, 2 April 2007
Acid sulfate soils 5. _ The application involves development on land situated in an identified tocal government area
For more ‘information refer to Guide-10--—~~ and where the surface of the land is: (tick applicable box)
Unless you answered “none of the above" to 05, L1(i) below 20m AHD® and the development will involve the excavation of 1000m3 or more of
- the application requires assessment by
Departinent of Natural Resources and Water soil or sediment at or below 5m AHD, or
(NRW). [1 (i) at or below 5m AHD and the development will involve filling the site with 1000m? or more
fan agency other than NRW is the assessment f material
Tanager for the application, NRW is an advice < :
agency for the application in relation to this {iii) none of the above
matter. . . oe _ . eee cae
Major hazard facilities or possible 6. Does the application involve a material change of use for.a major hazard facility or possible
major hazard facilities majorazard facility as defined under the Dangerous Goods Safety Management Act 2001?
For more information refer to Guide 17. ‘0 .
Ifyou answered “YES" to Q6, the application
requires assessment by the Department of Oo YES - complete Part L of Form 1
Emergency Services (DES).
If an agency other than DES is the assessment
manager for the application, DES is a
concurrence agency for the application in
relation to this matter.
Water related development under the |7. The application involves: :
Water Act 2000 (1 (i) operational work, for taking ¢ or interfering with water under the Water Act 2000, that is:
For more information about items (a) — (f}, refer (tick applicable box/es)
to Guide 15. For more information about item
(Q), refer to Guide 14 Does my application [1 (a) ina watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or
involve assessment of a referable dam? dam) - complete Part K2, K3, Ks, Ke, or Ks of Form 1 whichever is applicable;
Unless you answered “none of the above" to Q7, (2 (b) for an artesian bore anywhere in the State, no'matter what the use - complete Part
the application requires assessment by the . .
Department of Natural Resources and Water Ky of Form 1,
(NRW). . . (1 (c} for a subartesian bore, in declared subartesian area’, or in a certain area covered
fan agency ride an we ihe assessment by a water resource plan, for use for purposes other than stock and/or domestic
Manager for the application, isa
concurrence agency for the application in USE - complete Part Kr of Form 1, . .
relation to this matter. C1 (d) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part K: of Form 1;
O (e) for taking overland flow water in certain areas covered by awaterresource plan *
complete Part Ks of Form 1;
(2 (f) for interfering with overland flow water in a drainage and embankment area -
complete Part Kioof Form 1
(1 (g) ‘for constructing a referable dam? or works that will increase the storage capacity /
of a referable dam by more than 10% - complete Part Ks of Form 1; or
fi) none of the above. - ; a .
Removal of quarry material from a 8. Does the application involve development for the removal of quarry material from a watercourse?
Cann
watercourse
For more information refer to Guide 16.
If you answered “YES" to Q8, the application
requires assessment by the Department of
Natural Resources and Water (NRW).
If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence-agency for the application in
relation to this matter.
Note: Part G of Form 1 is required to be
. completed as the activily of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).
one an allocation notice under the Water Act 2000?
NO .
(11 YES - complete Parts Kr and G of Form 1
The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vala, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
Australian Height Datum {AHD),
The declared ground water areas are listed in Guide 13 Develooment in a declared catchment area.
Referable dam is defined under the Water Act 2000.
Watescourse is defined in sch 10 of the IPA.
Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0924 - Op Works - Transport Type 5 - Domestic Marine [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.