Maximise retention of existing vegetation to reduce soil disturbance and provide filter strip
treatment for runoff;
Install construction entry and exit shakedown areas;
Sediment fences are to be installed on the downstream boundaries of the subject site; and
Install dust control measures as required.
All erosion and sediment control measures are to be designed and installed in accordance with IECA
Guidelines. Further details regarding the proposed erosion and sediment control measures will be
provided during the detailed design phase of the development.
Further to the above considerations, it is the developments intent to limit ground disturbing activities
to a minimum. Other than a portion of the carparking area, all structures and footpaths are proposed
to be suspended over the existing surface.
6.2.2 Bulk Earthworks Phase
During the bulk earthworks phase, the following erosion and sediment control measures will need to
be installed in addition to the aforementioned measures (Pre-Development Phase) to ensure there
is minimal disturbance to downstream receiving water bodies:
Construction chutes to control runoff over earthworks batters;
Construction of temporary bunds at the top of all earthworks batters to ensure runoff is directed
away from exposed batters;
Sediment basins to be constructed at low points within each stage of the proposed development;
Sediment fences to be installed on the downstream side of any stockpiles; and
Stabilisation of all batters upon reaching the finished earthworks levels.
All erosion and sediment control measures are to be designed and installed in accordance with IECA
Guidelines. Further details regarding the proposed erosion and sediment control measures will be
provided during the detailed design phase of the development.
6.2.3 Construction Phase
During the construction phase of the development, there is a risk of sedimentation transport due to
disturbed land. The following erosion and sediment control measure will need to be installed in
addition to the aforementioned measures (Pre-Development and Bulk Earthworks Phases) to ensure
there is minimal disturbance and the quality of runoff is maintained to an acceptable standard:
Construction of temporary diversion drains to divert water to sediment basins;
Construction of temporary diversion drains to divert water to protect bioretention and treatment
devices as required;
Sediment barriers to be installed on all entrances to newly constructed stormwater infrastructure
(i.e. gully pits);
Sediment fences to be installed on the downstream side of any stockpiles and batters; and
Re-vegetation of all disturbed areas within two (2) weeks of completion.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 14
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.