Attachment 7B - Site Based Stormwater Manamgment Plan by ADG
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
altered stormwater quality or flows, and
wastewater (other than contaminated stormwater and sewage), and
the creation or expansion of non-tidal artificial waterways, and
Demonstrate compliance with the SPP code - Water quality (Appendix 3).
Appendix 2 (Table B) of SPP 2017 suggests ‘Post Construction Phase – Stormwater Management
Design Objectives’ as:
Table 2 - South East Queensland (SEQ) Targets
Total Suspended Solids Total Phosphorus Total Nitrogen Gross Pollutants
(TSS) (TP) (TN) >5mm
80% Removal 60% Removal 45% Removal 90% Removal
Along with the SPP 2017, The Noosa Plan 2020 Water Quality and Drainage Code acceptable
outcome AO6.1 states that;
Stormwater runoff discharging into High Ecological Value waters as a result of development causes
no increase in gross pollutants, total suspended solids, total phosphorous or total nitrogen compared
to a pre-development scenario.
Since the development site slopes toward and discharges to Weyba Creek, no pollutants compared
to pre-development can be discharged from the site.
The objective is to provide the following:
Nitrogen and Phosphorous removal
Gross Pollutant and Suspended Solids Removal
All of the site’s impervious areas discharge to suitable treatment device/s
Treatment device selection criteria are to be in accordance with Industry Best Practice and,
WSUD Engineering Guidelines
6.2 Site Analysis and Design Strategy
6.2.1 Pre-Development Phase
An Erosion Hazard Assessment has been carried out for the proposed development – refer to
Appendix F for a copy of the completed Noosa Shire Council form. As a result of this assessment,
it was determined that the overall site is a ‘low’ risk.
Prior to construction commencing, the following erosion and sediment control measures will need to
be installed around the subject site to minimise disturbance and ensure the quality of runoff
discharging from the site is of an acceptable standard:
Sediment barriers to be installed on all entrances to downstream stormwater infrastructure (i.e.
gully pits);
Designation of transport routes through the site to minimise vegetation disturbance;
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.