Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
Floodplain protection, immunity and safety - for AO1
development areas The finished flood level is not less than the minimum Development will comply
PO1 design levels specified in Table 8.2.6.4
Development provides that for all flood events up to and
including the DFE:
1. the safety of people on the site is protected; and
2. the risk of damage to property on the site is avoided
or minimised as far as practicable.
PO2 AO2 Development will comply
All lots have sufficient area that is above the DFE flood level The minimum area above flood level (flood free area) for
or where modelling is not available, the highest each lot, is in accordance with Table 8.2.6.5.
recorded flood level, to safely and adequately accommodate
the intended use.
Page 1 of 9
June 2021
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.