Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
PO3 AO3
For reconfiguring a lot or operational works, development is Development areas are not filled to reduce flood risk. Development will comply
undertaken in a manner that ensures:
1. natural hydrological systems are protected from
erosion, scour or flood damage on the premises
or other premises;
2. natural landforms and drainage lines are
maintained to protect the hydraulic performance
of waterways and flood plain; and
3. development integrates with the natural
landform rather than modifying the landform to
suit the development as far as practicable.
PO4 AO4.1 N/A
For reconfiguring a lot, development does not compromise Development provides an effective evacuation route that
the safety of people resulting from the flood risk associated remains passable, with sufficient flood warning time, to
with events exceeding the DFE. enable people to progressively evacuate to safe areas
above the PMF in the face of advancing flood or waters for
events that exceed the DFE.
OR
AO4.2 N/A
Development provides for an area of sufficient size and
dimensions on site above the PMF that allows for safe
congregation and refuge.
Page 2 of 9
June 2021
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.