Skip to the record
Accept no imitations.

Original source · versioned page text

Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf

of 110

Page text read automatically using OCR, there may be inaccuracies

Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                         ACCEPTABLE OUTCOMES                                          COMMENTS
                                                              Guidelines (October 2014) and for Wetland Systems
                                                              the Wetland Technical Design Guideline (May 2017).


 Essential network infrastructure                             AO8                                                          To be complied with at detailed
 PO8                                                          Essential network infrastructure that is likely to fail to   design / construction stages.
 Essential network infrastructure maintains effective         function or may result in contamination when
 function during and immediately after flood and storm tide   inundated by flood water (e.g. water supply pipeline
 inundation events.                                           air valves and the like) is located above the DFE level
                                                              (or where the DFE has not been modelled for the
                                                              area, above the highest recorded flood level for the
                                                              area).




 Essential community infrastructure                           AO9.1                                                        N/A
 PO9                                                          Essential community infrastructure is sited and
 Essential community infrastructure is able to function       constructed to ensure that flood levels comply with
 effectively during and immediately after flood events.       flood immunity requirements specified in Table
                                                              8.2.6.4.




Page 6 of 9
June 2021

Log in to download the original (Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.