Original source · versioned page text
Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
AO9.2
Essential community infrastructure which is located
below the specified flood immunity requirements:
N/A
1. is designed and constructed to function
effectively during and immediately after
the recommended flood level event;
and
2. has direct access to low hazard
evacuation routes or an emergency
rescue area above the PMF, if it is
for emergency services (including
emergency shelters, police facilities,
hospitals and associated facilities).
Page 7 of 9
June 2021
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.