Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
PO5 AO5 Development will comply
For reconfiguring a lot or operational works, development In the Flood Hazard Overlay, or in areas otherwise
does not directly, indirectly or cumulatively alter the flood determined to be subject to the DFE or DSTE,
characteristics external to the development site for all development ensures:
flooding and inundation events up to and including 1. there is no loss of on-site flood storage
the DFE or DSTE based on:
capacity;
1. current climate conditions; and 2. all changes to level, depth, duration and
2. incorporating an appropriate allowance for the velocity of floodwaters are contained
predicted impacts of climate change. within the site for all flood events up to
and including the DFE based on current
climate and predicted impacts of climate
change at 2100;
3. there is no acceleration or retardation of
flows, or any retardation in flood warning
times, elsewhere on the floodplain and to
any overland flow paths; and
4. there is no increased stormwater ponding
on sites upstream, downstream or in the
general vicinity of the site.
Resilient building design and form AO6.1 Development will comply
PO6 Buildings are designed to integrate well with the street
Development ensures that building design and building form: level and the levels of adjoining properties to facilitate
1. accounts for potential flood risk; pedestrian flows and visual and physical connectivity
2. is resilient to flood events; and between the footpath and ground floors.
Page 4 of 9
June 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdfRelated documentApplication case desk ↗
About this file
- File size
- 46.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.