Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
Stormwater drainage design AO1
PO1 A stormwater management plan is prepared consistent Development will comply. Refer to
The development and its stormwater management system is with PSP6 Engineering Design Standards - Roads, Stormwater Management Plan, in
planned and designed having regard to: drainage and earthworks. specific stormwater quality and
1. the natural features of the site;
quantity section prepared by this
2. the need to avoid impacts and potential risks
office.
to ecologically important areas;
3. the likely effectiveness of erosion and sediment
control and stormwater drainage measures during
rainfall events during and post construction; and
4. the need to protect environmental values and water
quality of receiving waters both during and post
construction.
PO2 AO2.1 To be complied with at detailed
Stormwater drainage infrastructure is planned, designed and Stormwater drainage planning, design and construction design / construction stages in
constructed to: is in accordance with PSP6 Engineering Design conjunction with the Stormwater
Standards - Roads, drainage and earthworks and the Management Plan, prepared by
1. incorporate allowance for increased flood risk latest version of the Queensland Urban Drainage Design
and tidal inundation through pipework as a this office.
Manual.
result of climate change and sea level rise; AO2.2 Rainwater captured in Bioretention
2. ensure the development is adequately drained; The stormwater drainage system connects to a lawful Basin will gradually infiltrate to soil
and point of discharge in accordance with PSP6 Engineering
3. ensure stormwater is managed and lawfully
layers and freely discharges
Design Standards - Roads, drainage and earthworks. subsoil to an outfall to Weyba
discharged without altering stormwater
drainage characteristics external to the site. Creek
AO2.3 Development will comply, refer to
Stormwater flows discharging from the development are Stormwater Management Plan, in
demonstrated to be consistent with pre-development specific stormwater quantity
characteristics. section prepared by this office.
Page 1 of 12
June 2021
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.