Original source · versioned page text
Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
AO2.4 Development will comply, refer to
Development provides for the management of Stormwater Management Plan
stormwater to incorporate appropriate allowance for prepared by this office.
climate change impacts (including rainfall intensity and
sea level rise), in accordance in accordance with PSP6
Engineering Design Standards – Roads, Drainage and
Earthworks.
PO3 AO3.1 N/A. No stormwater from the site is
Stormwater drainage infrastructure conveys run-off in a Stormwater drainage infrastructure meets the desired directed towards roads.
manner that allows roads to deliver desired standards of standards of service for roads functionality set out in PSP6
service appropriate to the local conditions and local Engineering Design Standards - Roads, Drainage and
stormwater drainage characteristics. Earthworks.
PO4 AO4.1 N/A. Rainwater captured in
Stormwater infrastructure is compatible with existing The location, design and construction of stormwater Bioretention Basin will gradually
infrastructure, allows for easy access for the ongoing drainage structures is in accordance with PSP6 Engineering infiltrate to soil layers and freely
maintenance by Council, is cost effective across its design Design Standards - Roads, drainage and earthworks. discharges subsoil to an outfall to
life.
Weyba Creek. Refer to Stormwater
Management Plan prepared by this
office.
Page 2 of 12
June 2021
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.