Original source · versioned page text
Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
AO4.2 N/A. Rainwater captured in
Where infrastructure is located on private land an easement Bioretention Basin will gradually
is dedicated over the infrastructure in accordance with PSP6 infiltrate to soil layers and freely
Engineering Design Standards - Roads, drainage and discharges subsoil to an outfall to
earthworks. Weyba Creek. Refer to Stormwater
Management Plan prepared by this
office.
AO4.3 N/A. Rainwater captured in
Any alterations or repairs to infrastructure as a result of Bioretention Basin will gradually
the development are made at no cost to Council. infiltrate to soil layers and freely
discharges subsoil to an outfall to
Weyba Creek. Refer to Stormwater
Management Plan prepared by this
office.
AO4.4 Development will comply.
Development avoids stormwater inflow and infiltration to
the sewer infrastructure network.
AO4.5 N/A. Rainwater captured in
Stormwater infrastructure is designed to minimize Bioretention Basin will gradually
maintenance costs and the requirement for specialized infiltrate to soil layers and freely
equipment for maintenance techniques. discharges subsoil to an outfall to
Weyba Creek. Refer to Stormwater
Management Plan prepared by this
office.
Page 3 of 12
June 2021
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.