Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Attachment 7B - Site Based Stormwater Manamgment Plan by ADG · MCU22/0118

of 113

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (46.0 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 62, section 1. The text section number identifies this passage in the reader.

Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                          ACCEPTABLE OUTCOMES                                            COMMENTS
                                                                AO2.4                                                         Development will comply, refer to
                                                                Development provides for the management of                    Stormwater Management Plan
                                                                stormwater to incorporate appropriate allowance for           prepared by this office.
                                                                climate change impacts (including rainfall intensity and
                                                                sea level rise), in accordance in accordance with PSP6
                                                                Engineering Design Standards – Roads, Drainage and
                                                                Earthworks.
 PO3                                                           AO3.1                                                          N/A. No stormwater from the site is
 Stormwater drainage infrastructure conveys run-off in a       Stormwater drainage infrastructure meets the desired           directed towards roads.
 manner that allows roads to deliver desired standards of      standards of service for roads functionality set out in PSP6
 service appropriate to the local conditions and local         Engineering Design Standards - Roads, Drainage and
 stormwater drainage characteristics.                          Earthworks.




 PO4                                                           AO4.1                                                          N/A. Rainwater captured in
 Stormwater infrastructure is compatible with existing         The location, design and construction of stormwater            Bioretention Basin will gradually
 infrastructure, allows for easy access for the ongoing        drainage structures is in accordance with PSP6 Engineering     infiltrate to soil layers and freely
 maintenance by Council, is cost effective across its design   Design Standards - Roads, drainage and earthworks.             discharges subsoil to an outfall to
 life.
                                                                                                                              Weyba Creek. Refer to Stormwater
                                                                                                                              Management Plan prepared by this
                                                                                                                              office.




Page 2 of 12
June 2021

Used in these records

About this file

File size
46.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf · 46.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.