Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                        ACCEPTABLE OUTCOMES                                            COMMENTS
                                                             the requirement for specialized equipment, material or
                                                             maintenance techniques
                                                             AO8.3
                                                             Vegetated stormwater management systems to be
                                                             dedicated as public assets are established and maintained
                                                             during the maintenance period to ensure optimal
                                                             vegetated growth and that the functional elements of the        N/A
                                                             system achieve the design function at the end of the
                                                             maintenance period.

 PO9                                                         AO9.1                                                          To be complied with at detailed
 Treatment systems are designed to eliminate or minimise     Free draining inlets and outlets are provided to ensure that   design / construction stages.
 health, safety and aesthetic hazards, including risks
 associated with insect breeding, odour and public safety.
                                                             waters do not pond for more than 24 hours.
                                                             AO9.2                                                          To be complied with at detailed
                                                             Developments are designed to eliminate retaining walls in      design / construction stages.
                                                             excess of 0.8m for any water quality treatment device.
 Hydrology and waterway stability                            AO10
                                                                                                                            Development will comply, Refer to
 PO10                                                        The development is designed to:                                Stormwater Management Plan.
 Development prevents increased bed and bank erosion and             1. limit the peak 1 year ARI event discharge
 sedimentation in receiving waterways by avoiding changes               within the receiving waterway to the pre-
 in low rate, peak flow run-off and flow duration.
                                                                        development peak 1 year discharge;
                                                                     2. maximise pervious areas by using pervious
                                                                        alternatives for otherwise impervious areas
                                                                        wherever possible;




Page 6 of 12
June 2021

Log in to download the original (Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.