Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf

of 110

Page text read automatically using OCR, there may be inaccuracies

Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                       ACCEPTABLE OUTCOMES                                       COMMENTS
 PO13                                                       AO13.1                                                    To be complied with at detailed
 Development is designed and constructed to maintain        The location and form of stormwater discharge points do   design / construction stages.
 surface and ground water balances that sustain the         not alter the pre-development hydrology of receiving
 environmental values of water dependent ecosystems,        surface water or groundwater.
 including downstream aquatic, riparian, wetland and
 terrestrial ecosystems.                                    AO13.2                                                     N/A Development is not located
                                                            Developments located on groundwater recharge or            located on groundwater recharge
                                                            discharge areas are designed and managed in accordance     or discharge areas.
                                                            with a groundwater recharge and discharge management
                                                            plan prepared by a suitably experienced and qualified
                                                            groundwater hydrologist. The groundwater recharge or
                                                            discharge must demonstrate that the development does
                                                            not affect groundwater balances beyond the property
                                                            boundaries.
 Construction and establishment of stormwater               AO14.1                                                    To be complied with at detailed
 management systems                                         An erosion and sediment control plan prepared in          design / construction stages.
 PO14                                                       accordance with the International Erosion Control
 Construction methods provide for appropriate controls to   Association Best Practice Books demonstrates that the
 avoid entry and transport of litter, sediment, and         capture and release of stormwater achieves the design
 associated prescribed water contaminants into receiving    objectives listed in Table A: Construction phase –
 waters.                                                    stormwater management design objectives of the State
                                                            Planning Policy (Appendix 2).

                                                            AO14.2                                                    To be complied with at detailed
                                                            Construction works are designed and managed to restrict   design / construction stages.
                                                            the extent of clearing and soil exposure to the minimum




Page 9 of 12
June 2021

Log in to download the original (Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.