Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf

of 110

Page text read automatically using OCR, there may be inaccuracies

Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                           ACCEPTABLE OUTCOMES                                      COMMENTS
                                                necessary for access, and safe construction at any one
                                                time.
                                                AO14.3                                                    To be complied with at detailed
                                                For buildings:                                            design / construction stages.

                                                            1. upstream runoff is diverted around
                                                               the construction site;
                                                            2. sediment barriers are provided
                                                               downslope of disturbed areas to
                                                               prevent sediment washing into
                                                               gutters, drains and waterways ,
                                                               wetlands or drainage lines either on
                                                               or off the site; and
                                                            3. temporary or permanent downpipes
                                                               are connected to the stormwater
                                                               system before laying the roof; or
                                                            4. Localized erosion is avoided by
                                                               directing flow from downpipes over
                                                               non-erosive areas.
                                                AO14.4                                                   To be complied with at detailed
                                                Chemical flocculants used as part of an erosion and      design / construction stages.
                                                sediment control plan do not harm the environmental
                                                values within receiving waters.
                                                AO14.5                                                   To be complied with at detailed
                                                                                                         design / construction stages.




Page 10 of 12
June 2021

Log in to download the original (Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.