PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
necessary for access, and safe construction at any one
time.
AO14.3 To be complied with at detailed
For buildings: design / construction stages.
1. upstream runoff is diverted around
the construction site;
2. sediment barriers are provided
downslope of disturbed areas to
prevent sediment washing into
gutters, drains and waterways ,
wetlands or drainage lines either on
or off the site; and
3. temporary or permanent downpipes
are connected to the stormwater
system before laying the roof; or
4. Localized erosion is avoided by
directing flow from downpipes over
non-erosive areas.
AO14.4 To be complied with at detailed
Chemical flocculants used as part of an erosion and design / construction stages.
sediment control plan do not harm the environmental
values within receiving waters.
AO14.5 To be complied with at detailed
design / construction stages.
Page 10 of 12
June 2021
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.