1 INTRODUCTION
1.1 Background
ADG Engineers (Aust.) Pty Ltd was engaged by Aspect Architects to carry out a Site Based
Stormwater Management Plan (SBSMP) suitable for submission to Noosa Shire Council (NSC) and
any required referral agencies for a proposed Eco Resort Extension to the current RACV Noosa
Resort located at 94-142 Noosa Drive, Noosa Heads QLD 4567.
The purpose of this Stormwater Management Plan is to provide advice on the proposed development
about stormwater drainage, stormwater quality and quantity measures, and flooding. The required
infrastructure will be subject to the conditions attached to the Development Approval to be provided
by Noosa Shire Council and any nominated referral agencies.
1.2 Background Information
This report was compiled using information from the following sources:
‘Dial Before You Dig’ (DBYD) As-Constructed information;
NSC interactive mapping via DBYD (Refer to Appendix G);
NSC flood and stormtide inundation mapping (Refer to Appendix G);
Detailed survey plan prepared by Skyline Surveyors (Refer to Appendix A);
Architectural drawings by Aspect Architects (Refer to Appendix B); and
Google Maps Aerial Imagery.
1.3 Property Detail
The details of the property for the proposed development can be seen in Table 1 below.
Table 1- Property Detail
Title Lot 203 on SP267424, Lot 0 on SP203415 and Lot 3 on SP126203
Street Address 94 - 142 Noosa Drive, Noosa Heads QLD 4567
Total Site Area 63,839 m2
Developable Site Area 5,457 m2 (Lot 3 on SP126203)
The location of the proposed development is demonstrated in Figure 1.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.