Original source · versioned page text
SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published)
Very large file (18.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 131, section 1. The text section number identifies this passage in the reader.
Traffic Management Plan – 25040286
ITEM DESCRIPTION
Hours / Days of Work 9 hrs
Duration of Work 07:00 to 16:00
Other Constraints None
Concurrent/adjacent Works or No other works identified at this location
Projects
Contacts & Details
2.3 Existing Traffic and Road Environment
ITEM DESCRIPTION
Existing road configuration Two-way Divided
Existing pedestrian / cyclist facilities Footpath Existing near working Area and no Cycle lanes
at the working area
2.4 Community Considerations
ITEM DESCRIPTION
Sporting Venues N/A
Cultural Venues Pinaroo Park
Educational Institutions N/A
Medical Centres N/A
Shopping Complexes Noosa Junction K Hub
Entertainment Precincts Noosa Reef Hotel
Document Set ID: 24005412
23806880 Document MSF-AT-TMP-001| Issued 05 September 2024| Review: 05 September 2025| Owner: Trevor Leggett | Page: 7
Version: 1,
0, Version Date: 06/08/2025
01/01/1900 [UNCONTROLLED IF WHEN PRINTED AFTER 05 September 2024]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.