Traffic Management Plan – 25040286
2.5 Overview of Proposed TTM
ITEM DESCRIPTION
Temporary Traffic Management Trucks Turning Hold And Release
Descriptions
Speed zone dates and times N/A
Lane Closures dates and times N/A
Road Closures dates and times N/A
Signal modifications description N/A
Proposed lane widths 3m
Road Safety Barrier N/A
2.6 Project Representatives
POSITION NAME CONTACT DETAILS
Road Authority Noosa Shire Council
Representative
Local Government Noosa Shire Council
Project Manager / Daniel Cooper 0419 762 525
Principal Contractor
Traffic Supervisor / Daniel Cooper 0419 762 525
Manager
TMP Design David Stevens 0436 805 001
Document Set ID: 24005412
23806880 Document MSF-AT-TMP-001| Issued 05 September 2024| Review: 05 September 2025| Owner: Trevor Leggett | Page: 8
Version: 1,
0, Version Date: 06/08/2025
01/01/1900 [UNCONTROLLED IF WHEN PRINTED AFTER 05 September 2024]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.