SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published)
Very large file (18.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 140, section 1. The text section number identifies this passage in the reader.
Traffic Management Plan – 25040286
Initial Revised
Potential Risk Control Measures Action
Risk Risk
Evaluation
Consequence
Consequence
Likelihood
Likelihood
Source Event Options Who What
Rating
Rating
Risk
Worksite operations
18 1. Provide a path for VRU 1. Ensure enough Staff to perform duties,
1. Client
2. Use Signs and Devices to delineate and client to provide Lighting Towers if required
Sight distance or vision of road user direct the VRU 2. Ensure that TGS is drafted to accommodate
Extreme
Present 2. TMD
Medium
Likely
Major
Major
Site in operation compromised on approach to worksite 3. Place a repeater of all signage. VRU
Rare
at this
during times of results in road user unable to respond in 4. Provide Lighting Towers due to poor 3. Ensure that Signs and Devices are installed
location 3. TMI
night / low visibility a timely manner to the hazard ahead lighting. as per the TGS. Night wands are to be utilised.
5. TMI and TCs are to do regular site checks 4. Ensure that night wands are utilised for
4. TC
and report any site distance or visual issues night works.
1. Ensure enough Staff to perform duties.
19 Work occurs at inappropriate times of 1. Work are to take place outside of peak-
Ensure that locals are notified by letterbox
the day. hours 1. Client
drop.
- Disruption of residential areas 2. Ensure work is done within the approved
2. Ensure that TGS is drafted to
Moderate
- Interference with known peak traffic Present permit times 2. TMD
Major
Major
accommodate VRU
Rare
High
Low
Periods in which work times at this 3. Where practical, local & business access is
3. Ensure that Signs and Devices are installed
can and cannot occur. - Frequent interference with usual location to be maintained 3. TMI
as per the TGS
business activity 4. Reduction of noise and dust where possible
4. Ensure that they are stationed in a position
- Dust and noise impacts on 5. Advise locals of upcoming works i.e. 4. TC
to guide or chaperone VRU around the site
surrounding areas letterbox drop
safety
20 1. Ensure enough Staff to preform duties
1. Client 2. Ensure that TGS is drafted to accommodate
1. Ensure enough TCs to allow the required VRU
Moderate
Extreme
Staff fatigue leads to decreased Present mandatory breaks 2. TMD 3. Ensure that Signs and Devices are installed
Medium
Unlikely
Likely
Major
TTM implementation for concentration of road workers leading to at this 2. TCs are to rotate duties to decrease fatigue as per the TGS. Ensure required breaks are
excessive time within a increased likelihood of incidents location 3. Company to ensure mandatory breaks 3. TMI taken.
single shift between each working shift are met 4. Ensure that they are stationed in a position
4. TC to guide or chaperone VRU around the site
safety. Ensure required breaks are taken.
Emergency Vehicles
21 1. Client
1. Notifications to the emergency services 1. Ensure works are scheduled as per permits
Works leads to
Emergency vehicles access past the 2. Works are to be programmed outside of and emergency services have been notified
Extreme
excessive traffic queues Present 2. TMD
Medium
Unlikely
Likely
Major
Major
works area is blocked by works activities peak hours 2. N/A
and delays leads to at this
or queued traffic leading to unacceptable 3. Pre-start to cover actions required for when 3. Pre-start communications
unacceptably long location 3. TMI
delays to emergency vehicles emergency vehicles are approaching the 4. Notify when emergency vehicles are on
delays to road users.
jobsite approach and prioritise
4. TC
Document Set ID: 24005412
23806880 Document MSF-AT-TMP-001| Issued 05 September 2024| Review: 05 September 2025| Owner: Trevor Leggett | Page: 16
Version: 1,
0, Version Date: 06/08/2025
01/01/1900 [UNCONTROLLED IF WHEN PRINTED AFTER 05 September 2024]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.