Original source · versioned page text
SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published)
Very large file (18.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 146, section 1. The text section number identifies this passage in the reader.
Traffic Management Plan – 25040286
Initial Revised
Potential Risk Control Measures Action
Risk Risk
Evaluation
Consequence
Consequence
Likelihood
Likelihood
Source Event Options Who What
Rating
Rating
Risk
43
Road alignment results 1. Client
If Work site conditions change and this Source
in complex requirements 1. Monitor work site conditions
Reduced TTM device effectiveness Not / Event becomes a concern a Site-Specific
for the alignment of TTM 2. TMD 2. Contact details supplied.
Present Risk Assessment shall be undertaken and if
Minor
Rare
Low
creating potential confusion or 3. Report any changes to conditions to PC or
devices to ensure their at this the situation is unable to be addressed
hazardous situations and conflicts. 3. TMI Supervisor
visibility and location Contact Supervisors and/or TMD for further
4 Report any changes to the Team leader
comprehension by the actions
4. TC
intended road users
In evaluating the options, a key consideration is whether the option takes traffic around, through or past the worksite.
Document Set ID: 24005412
23806880 Document MSF-AT-TMP-001| Issued 05 September 2024| Review: 05 September 2025| Owner: Trevor Leggett | Page: 22
Version: 1,
0, Version Date: 06/08/2025
01/01/1900 [UNCONTROLLED IF WHEN PRINTED AFTER 05 September 2024]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.