Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published)

of 180

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (18.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 154, section 1. The text section number identifies this passage in the reader.

     Traffic Management Plan – 25040286

          7. SAFETY PLAN
          7.1 Occupational Safety and Health

     All persons and organisations undertaking these works or using the roadwork site have a duty of care under
     statute and common law to themselves, their employees and all site users, lawfully using the site, to take all
     reasonable measures to prevent accident or injury.

     This TMP forms part of the overall project Safety Management Plan and provides details on how all road users
     considered likely to pass through, past, or around the worksite will be safely and efficiently managed for the full
     duration of the site occupancy and works.

          7.2 Roles and Responsibilities

          7.2.1     Responsibilities

     The Project Manager has the ultimate responsibility to ensure the TMP is implemented for the prevention of
     injury and property damage to employees, contractors, sub-contractors, road users and all members of the
     public.

     The Project manager will ensure all site personnel are fully aware of their responsibilities, and that Traffic
     Controllers are appropriately trained and accredited and that sufficient controllers are available to ensure
     appropriate breaks are taken.

     All personnel engaged in the field activities will follow the correct work practices as required by the CoP,
     AGTTM and AS1742.3.

     All personnel will not commence or continue work until all signs, devices and barricades are in place and
     operational in accordance with the requirements of the TMP.

     All personnel responsible for temporary traffic management shall ensure that the number, type and location of
     signs, devices and barricades are to a standard not less than Appendix F of this plan, CoP, AGTTM and
     AS1742.3 (except where specifically detailed in this TMP with reasons for the variations). Should a situation
     arise that is not covered by this TMP, CoP, AGTTM or AS1742.3, the Road Authority Representative shall be
     notified.




Document Set ID: 24005412
                  23806880Document MSF-AT-TMP-001| Issued 05 September 2024| Review: 05 September 2025| Owner: Trevor Leggett | Page: 30
Version: 1,
         0, Version Date: 06/08/2025
                          01/01/1900             [UNCONTROLLED IF WHEN PRINTED AFTER 05 September 2024]
Log in to download the original file

SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published).pdf · 18.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.