Skip to the record
Beware of cheap imitations.

Original source · versioned page text

SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published)

of 180

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (18.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 157, section 1. The text section number identifies this passage in the reader.

     Traffic Management Plan – 25040286

          8. IMPLEMENTATION
          8.1 Communicating TMP Requirements

     Prestart meeting to include requirements of the TMP – which stage of the works are going to be undertaken
     and which TGS to be used. All Traffic Management crew are to sign on acknowledging their awareness of the
     requires of the TMP and the planned works for each shift.

          8.2 Traffic Guidance Schemes

     The Traffic Guidance Scheme (TGS) outlined in 15 Appendix A TRAFFIC GUIDANCE SCHEMES and listed
     below have been provided for the following stages to demonstrate the type of controls that will be implemented
     throughout the term of the contract. All sign and device requirements are shown on each TGS. Should the use
     of additional (not shown on the TGS or listing of devices) or reduced number of devices be required due to
     unforeseen needs, they shall be recorded within the Daily Diary as a variation to the TMP, following prior
     approval.

                                       Traffic
           Construction
                                     Management                       TGS Number and version                                   Details
             Stages
                                       Stages

              Stage 1                       1                     25040286-TGS 01-TT-HR-CMI-                     Trucks Turning Hold & Release
                                                                  Serenity Close_Noosa Heads-R0




          8.3 Sequence and Staging

     The sequence of temporary traffic management installation, work activities and temporary traffic management
     removal are shown in the table below.

                         Step           Details


                           1            Prestart meeting

                           2            Implement TGS

                           3            Drive through site to ensure implementation is correct Works not to commence until this
                                        has been completed

                           3            Ingress of plant and equipment

                           4            Complete works

                           5            Egress of plant and equipment

                           6            Remove TGS in reverse order to the Implementation.

                           8            Drive Through Site to ensure all Temporary Traffic Management Devices have been
                                        removed and all regulatory signage has been reinstated.




Document Set ID: 24005412
                  23806880Document MSF-AT-TMP-001| Issued 05 September 2024| Review: 05 September 2025| Owner: Trevor Leggett | Page: 33
Version: 1,
         0, Version Date: 06/08/2025
                          01/01/1900             [UNCONTROLLED IF WHEN PRINTED AFTER 05 September 2024]
Log in to download the original file

SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published).pdf · 18.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.