Original PDF page 158, section 1. The text section number identifies this passage in the reader.

     Traffic Management Plan – 25040286

          8.4 Implementing Traffic Guidance Schemes

     As detailed by the MUTCD, AGTTM and The Code all personnel who install or dismantle TGS shall hold a
     current Implement Traffic Guidance Scheme qualification. All traffic guidance schemes are implemented under
     AGTTM Part 5 Short Term Low Impact Work sites or as described on the TGS and will generally follow the below
     approach.

          8.4.1     Implementation a TGS

                    •    Determine points of reference and conduct a site-based
                         risk assessment.
                    •    Install detours (if required) (e.g. setup detour prior to
                         closing road).
                    •    Sign upside roads (if required) either sequentially,
                         before or after the road being worked on.
                    •    Install signs on the road being worked on, taking into
                         account Lateral Shift or Contra-Flow, implement setup
                         on non-works side of the roadway first.
                    •    Cover pre-existing conflicting signs as you go.
                    •    Install remaining on road devices (e.g. cones, bollards,
                         delineators). `
                    •    Perform implementation check (e.g. drive through).



          8.4.2     Remove TGS

                    •    Confirm work has ceased and ensure workers, plant
                         and equipment are off the roadway.
                    •    Clear the road being worked on of devices (lateral
                         shift, contraflow must be removed, work area side 1st)
                    •    Remove implemented signage from the road being
                         worked on. Work area is able to be opened to traffic.
                    •    Reinstate pre-existing signage.
                    •    Clear side roads of devices, signs and detour signs
                         and open side roads.




Document Set ID: 24005412
                  23806880Document MSF-AT-TMP-001| Issued 05 September 2024| Review: 05 September 2025| Owner: Trevor Leggett | Page: 34
Version: 1,
         0, Version Date: 06/08/2025
                          01/01/1900             [UNCONTROLLED IF WHEN PRINTED AFTER 05 September 2024]
Log in to download the original file

SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published).pdf · 18.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.