FIGURE 2.9: SENSITIVITY 3 – PARTIALLY BLOCKED RIP - 1% (2100) AEP FULLY BLOCKED – DEPTH AND HAZARD
2.3 Lawful Point of Discharge
The Queensland Urban Drainage Manual (QUDM) (4th Edition – Institute of Public Works Engineering Australasia, Queensland Division)
identifies that a test can be undertaken to determine whether a lawful point of discharge exists:
The criteria for determining the lawful point of discharge are:
• Will the proposed development alter the site’s stormwater discharge characteristics in a manner that may substantially damage a third-
party property (see Section 3.6)?
• If not, then no further steps are required to obtain tenure for a lawful point of discharge (assuming any previous circumstances
and changes were lawful).
The existing stormwater outlet has been relocated approximately 130m to the south-west of the existing outlet, with the discharge location
remaining in NSC Reserve, which is considered the sites lawful point of discharge.
DocumentNOOSA
Set ID:CALILE I BBNE01676-0001-REP-001-1
23806878 16
Version: 0, Version Date: 01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.