Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published)

of 180

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (18.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 20, section 1. The text section number identifies this passage in the reader.

        3. CONCLUSION
        Engeny Australia Pty Ltd (Engeny) have been engaged by Calile Malouf Investments Pty Ltd to prepare a Local Overland Flow Assessment for
        a proposed Operational Works (OPW) development for application resort complex and shop at 3 & 7 Serenity Close Noosa Heads QLD 4567.
        Detailed overland flow modelling has been completed at a level of detail appropriate for Operational Works approval to confirm Alta Project’s
        proposed realigned drainage and overland flow design through the site is appropriate in achieving the design requirements for the project.

        The assessment has found that flows can be appropriately managed through the site via an overland flow path which connect into the
        Serenity Close cul-de-sac footpath, without impacting adjoining properties or resulting in non-compliant flows with the road and footpath.

        The assessment found that the finished floor levels of each building achieve a minimum 0.5m freeboard and is able to contain the severe
        storm event (i.e. 1% (2100) AEP fully blocked stormwater network).

        Three sensitivity assessments were completed, which assessed increased in flow path roughness and increase in flow reporting from external
        catchments. Each of the sensitivities highlighted that there were only minor changes resulting, with flow depth only increasing by up 0.1m,
        well below the 0.5m freeboard applied to the development. The flow hazard (DV) also had a minor change, with hazard remaining below
        0.40m2/s.

        Reinforced turf is recommended for the last 20m of channel upstream of Serenity Close (velocity up to 2.30 m/s) and rock protection be
        placed to manage the outlet velocities (rock size D50 = 200mm and extend 3.6m past the outlet).




DocumentNOOSA
           Set ID:CALILE  I BBNE01676-0001-REP-001-1
                   23806878                                                                                                                       17
Version: 0, Version Date: 01/01/1900
Log in to download the original file

SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published).pdf · 18.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.