Original source · versioned page text
SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published)
Very large file (18.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
DISCLAIMER
This Report has been prepared on behalf of and for the exclusive use of Calile Malouf Investments and is subject to and issued in accordance
with Calile Malouf Investments instruction to Engeny Australia Pty Ltd (Engeny). The content of this Report was based on previous information
and studies supplied by Calile Malouf Investments.
Engeny accepts no liability or responsibility whatsoever for it in respect of any use of or reliance upon this Report by any third party. Copying
this Report without the permission of Calile Malouf Investments or Engeny is not permitted.
Rev Date Description Author Reviewer Project Mgr. Approver
0 28/02/2025 Client Issue Zhenglong Li Brendon Bolt Zhenglong Li Brendon Bolt
1 09/06/2025 Client Issue Zhenglong Li Brendon Bolt Zhenglong Li Brendon Bolt
DocumentNOOSA
Set ID:CALILE I BBNE01676-0001-REP-001-1
23806878 ii
Version: 0, Version Date: 01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.