Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published)

of 180

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (18.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

        CONTENTS
        1.      Introduction                                                                                                                                                                                              1
                1.1         Site Characteristics                                                                                                                                                                          1
                1.2         Regional Flooding                                                                                                                                                                             2
                1.3         Project Data and Guidelines                                                                                                                                                                   2
                1.4         Performance Criteria                                                                                                                                                                          3

        2.      Overland Flow Assessment                                                                                                                                                                                  4
                2.1         Local Hydrology Model                                                                                                                                                                         4
                            2.1.1          Catchments                                                                                                                                                                     4
                            2.1.1          Modelling Parameters                                                                                                                                                           6
                            2.1.2          Summary of Peak Flows                                                                                                                                                          6
                2.2         Local Flood Model                                                                                                                                                                             6
                            2.2.1          Model Setup                                                                                                                                                                    6
                            2.2.1          Results                                                                                                                                                                      10
                            2.2.1          Sensitivity Results                                                                                                                                                          14
                2.3         Lawful Point of Discharge                                                                                                                                                                   16

        3.      Conclusion                                                                                                                                                                                              17
        4.      Qualifications                                                                                                                                                                                          18
        Appendix A: Site Layout                                                                                                                                                                                         19
        Appendix B: Engineering Design Plans                                                                                                                                                                            20
        Appendix C: Proposed Flood Maps                                                                                                                                                                                 21

        Tables
        Table 2.1: Existing and Developed Catchment Parameters ................................................................................................................................. 4
        Table 2.2: Key modelling parameters - Hydrology ............................................................................................................................................... 6
        Table 2.3: Peak Discharge .................................................................................................................................................................................... 6
        Table 2.4: Adopted manning’s ‘n’ roughness....................................................................................................................................................... 7
        Table 2.5: Summary of Finished Floor Levels and Flood Immunity.................................................................................................................... 11

        Figures
        Figure 1.1: Site Locality ........................................................................................................................................................................................ 1
        Figure 1.2: NSC Flood Hazard Mapping ............................................................................................................................................................... 2
        Figure 2.1: Catchment Plan .................................................................................................................................................................................. 5
        Figure 2.2: TUFLOW Setup ................................................................................................................................................................................... 8
        FIGURE 2.3: MANNING’S ‘N’ VALUE..................................................................................................................................................................... 9
        Figure 2.4: Excerpt of Flood Depth and DV Map - 1% (2100) AEP ..................................................................................................................... 10
        Figure 2.5: Freeboard Assessment..................................................................................................................................................................... 12
        Figure 2.6: Excerpt of Severe Storm depth map - 1% (2100) AEP Fully Blocked ................................................................................................ 13
        Figure 2.7: Sensitivity 1 – Increased Flow Path Roughness - 1% (2100) AEP Fully Blocked – Depth and Hazard............................................... 14
        Figure 2.8: Sensitivity 2 – Blocked RIP - 1% (2100) AEP Fully Blocked – Depth and Hazard .............................................................................. 15
        Figure 2.9: Sensitivity 3 – Partially Blocked RIP - 1% (2100) AEP Fully Blocked – Depth and Hazard................................................................. 16




DocumentNOOSA
           Set ID:CALILE  I BBNE01676-0001-REP-001-1
                   23806878                                                                                                                                                                                              iii
Version: 0, Version Date: 01/01/1900
Log in to download the original file

SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published).pdf · 18.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.