Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published)

of 180

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (18.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 7, section 1. The text section number identifies this passage in the reader.

        2. OVERLAND FLOW ASSESSMENT
        The objective of this assessment is to investigate the impacts the proposed development has on peak flows discharging from the Site to the
        receiving drainage path (and lawful point of discharge) to determine if no nuisance of flow conditions is achieved.


        2.1          Local Hydrology Model
        The objective of the hydrologic assessment is to investigate the potential impact the development may have at the site outlet (southwest
        boundary where flow path exists the site) and identify if any further mitigation measures are required.

        Hydrologic modelling of the catchment has been carried out using WBNM software developed jointly by the University of Wollongong, Rienco
        Consulting and Balance R&D. The 2019 version has been used for this investigation with ARR2019 hydrology being used.

        Modelling has been carried out for the 1%, 10% AEP storm events and 1%, 10% AEP Climate Change (2100) for a range of durations. The
        following scenarios have been investigated:

        (1)    Developed Scenario – Represents the proposed development, associated earthworks and proposed drainage network.


             2.1.1    Catchments
        The flow path that influences the Site includes properties on northern side of Serenity Close to the properties on western side of Serenity
        Close and entire Serenity Close. Details of the catchments can be found in ALTA Engineering Catchment Layout Drawings (ref. A6769-23-
        SMP07, dated 20/01/2025). The Developed (Post-development) catchment and impervious percentages detailed below in Table 2.1. Fraction
        impervious values have been based on the ALTA’s drawings.

        A catchment plan is provided in Figure 2.1.

        TABLE 2.1: EXISTING AND DEVELOPED CATCHMENT PARAMETERS

                                                                                        Developed
                  Sub-Catchment
                                                              Area (ha)                                     Fraction Impervious (%)

         Lot 12                                                  0.96                                                  80

         Lot 4                                                   0.25                                                  80

         Lot 5                                                   0.28                                                  80

         4A                                                      0.08                                                  80

         4B                                                      0.08                                                  80

         Road                                                    0.61                                                  80

         CA_4                                                    0.21                                                  20

         CA_5                                                    0.19                                                  20

         6                                                       0.1                                                   20

         7                                                       0.15                                                  80

         8                                                       0.13                                                  80

         TOTAL                                                   3.04                                                   -



DocumentNOOSA
           Set ID:CALILE  I BBNE01676-0001-REP-001-1
                   23806878                                                                                                                      4
Version: 0, Version Date: 01/01/1900
Log in to download the original file

SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published).pdf · 18.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.