Skip to the record
The only place to find full transcripts.

Original source · versioned page text

SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published)

of 180

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (18.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 63, section 1. The text section number identifies this passage in the reader.

                      Future Transport Demands

                      Assessment Years and Traffic Growth

            To estimate the future traffic volume for the 2025 scenario, the annual growth rate for the Council has been
            determined based on the following:

                 •    The forecasted population volume set out in Section 4.2 of Noosa Shire Economic Development
                      Strategy 2021-2030. For Noosa, the population growth between 2020 and 2041 is projected to be
                      0.8%.
                 •    The existing and projected demand for the transport network set out in Table SC3.1.7 of Council’s
                      LGIP Planning Assumptions Tables.
                 •    For the Coastal Area (Noosa Heads), the existing and projected transport demand vehicle per day
                      (vpd) data between 2021 (331,603) and 2031 (369,091) is projected to be 1.08%.

            Conservatively, an annual growth rate of 1.2% has been adopted.

            Colliers has identified three assessment periods for the road network as follows:

            Current Traffic Scenario

            This scenario includes the 2022 traffic volumes modelled over the existing road network. This analysis has
            been performed for both the AM and PM Peaks.

            Base Year (2025) Traffic Scenario

            This analysis incorporates a 1.2% per annum increase in the background traffic volume for a period of 4
            years from the most recent survey. For the base case scenario, the existing road network has been analysed.

            Base Year (2025) Traffic Scenario + Earthworks Traffic

            Based on the development transport demand estimates (Section 1), traffic network diagrams have been
            prepared showing traffic movements on the roads/intersections surrounding the development site for each
            of the above scenario’s future year cases. These network diagrams are included in Attachment B – Network
            Diagrams with the respective diagrams identified as follows:

            •    Traffic Network Diagrams 1: 2022 Survey Traffic Volumes

            •    Traffic Network Diagrams 2: 2025 Base Case Traffic Volumes (Applying 1.2% Growth)

            •    Traffic Network Diagram 3: 2025 Base + Earthworks Traffic Volumes

                 -    This has been calculated by adding estimated Bulk Earthworks traffic volumes to the 2025 Base
                      scenario.




            Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
            Reference: 22BRT0122

Document Set ID: 24005503
                  23806879
Version: 2,
         0, Version Date: 07/08/2025
                          01/01/1900
Log in to download the original file

SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published).pdf · 18.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.