Original source · versioned page text
2019-10-28 Special Meeting Agenda - Item 1 - Attachment 3 - RAL18-0023 - Master Plan Stage 1
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnCHOOSING FUTURES: Shire Business Centre Master Plan - Stage 1 12
4. MASTER PLAN OUTCOMES: STAGE 1 4.1 CONCEPT PLAN
Map 4.1 is derived from the simple concepts
In this section, the master planning outcomes for provided in Figure 3.1 and Figure 3.2. It provides a
Stage 1 are described. more detailed concept plan for the site and the roads
about the site. An A3 version of Map 4.1 is found at
the end of this document.
MAP 4.1 DETAILED SUB-PRECINCT CONCEPTS
PB3
A2 R1 PB2
PB1
OS6 B3
ESH
OS5 REC
OS3
E4 E1 E6
RES A1
R3
E5 OS7 B1
OS4
PB4
A4 PK B2
R4
E3 E7 R2
E2
OS2 A3
OS1
PB5
SHIRE BUSINESS CENTRE
MASTER PLAN: Stage 1 - Concepts
SCALE: 1:3,500 (at A3)
DATE: May, 2001
STATUS: Final, endorsed by Council </</2001
H:\Shire Business Centre\NSC Master Plan\Mapping\Master Plan.wor
n
a Pla s
s
N o o uture
e F
J C:\Documents and Settings\oludvigsen\Local Settings\Temporary Internet Files\OLK7\Master Plan.doc Th o s ing
o
Ch
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 1 12
4. | MASTER PLAN OUTCOMES: STAGE 1 | | 4.1___ CONCEPT PLAN
In thi ti th t lanni t f Map 4.1 is derived from the simple concepts
St 4 sec des ibe i er planning oulcomes Tor provided in Figure 3.1 and Figure 3.2. It provides a
age | are described. more detailed concept plan for the site and the roads
about the site. An A3 version of Map 4.1 is found at
the end of this document.
Map 4.1 DETAILED SUB-PRECINCT CONCEPTS
TTT L
PB % A ~
i 4; PB
GY oF 5 s
ko
yen DE
| 66 Be
B37 ~ 31
i
| EC
WS
yi
SHIRE BUSINESS CENTRE SCALE: 1:3,500 (at A3)
MASTER PLAN: Stage 1 - Concepts STATUS! Pinal endorsed by Council </</2001
e\a"
00° ve?
Tre a6
J C:\Documents and Settings\oludvigsen\Local Settings\Temporary Internet Files\OLK7\Master Plan.doc creeSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.