2019-10-28 Special Meeting Agenda - Item 1 - Attachment 3 - RAL18-0023 - Master Plan Stage 1
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnCHOOSING FUTURES: Shire Business Centre Master Plan - Stage 1 14
g. Key internal roads R3 and R4 comprising 3.2 TABLE 4.2 PRIMARY & SECONDARY FUNCTIONS &
hectares and forming a Loop Road with a PLANNING SCHEME DEFINITIONS
component that would lie below the surrounding
surface level. PRIMARY SECONDARY PRINCIPAL DEFINITIONS
FUNCTIONS FUNCTIONS FROM THE SCHEDULE TO
h. A potential basement Parking Precinct THE PLANNING SCHEME
beneath Sub-Precincts B1, B2 and E2 (part). MAKING UP THE PRIMARY &
i. Key Pedestrian and Bikeway Linkages PB1, SECONDARY FUNCTIONS
PB2, PB3 and PB4. Business Office & Commercial premises;
Showroom professional offices; showrooms
4.3 KEY DEVELOPMENT CHARACTERISTICS BY SUB-
Park
PRECINCT & TRAFFIC TYPE
Retail Centre Commercial services; service
For the purposes of this Master Plan, a range of land shops; shops
uses defined within the Schedule to the Planning
Scheme, have been condensed to a nested series of Transit, Office Commercial premises;
definitions relating to the primary and secondary & Civic Park professional offices
functions defined by Map 4.1 and Table 4.1. Employment Educative Educational establishments
These are indicated in Table 4.2. Note that the land Research
uses indicated in the final column are the principal
Environmental Commercial premises;
definitions only. Other land uses that are not listed in Research educational establishments;
Table 4.2 may occur, though these functions would professional offices
not be dominant in the precincts in which they occur.
Industry Light industries; service
The discussion in this Master Plan provides a guide industries; service shops
to the use intentions associated with the defined
precincts and the scale of development intended for Technology- A definitive indication is not
those precincts. Final decisions will be determined Based R & D provided, as the combination of
via the second stage of the master plan process and land uses will relate to the
theme of the particular
any relevant development application.
employment category; however
Table 4.3 (on page 16) defines the key development it could be expected that the
characteristics for the various sub-precincts. Note uses will include:
that it provides the key characteristics only with Commercial premises;
Stage 1 of the Master Plan being reliant on both educational establishments;
Stage 2 and subsequent development applications to professional offices
refine, provide the necessary legal framework for and
Uncommitted A definitive indication is not
to implement these characteristics. provided, as the combination of
Table 4.3 includes the following components: land uses will relate to the
theme of the particular
• Sub-Precinct: The sub-precinct number on Map employment category.
4.1.
Open space Environmental Parks
• Primary Function: The primary function from
Table 4.2. Environmental Parks
• Secondary Function: The secondary function Drainage
from Table 4.2. Recreation Indoor entertainment; outdoor
• Objective: The objective for the particular sub- entertainment; parks; sport and
precinct. recreation
• Process Principles: Initial Integrated Residential Accommodation buildings;
Development Assessment System processes multiple dwellings
under the Integrated Planning Act for key forms
• Strategic Plan Provisions: The Strategic Plan
of development (material changes of use and
provisions that have direct influence on issues
reconfiguration). Material changes of use based
associated with the sub-precinct. There will be
on land uses indicated in Table 4.2 and
many other provisions of the Strategic Plan that
reconfiguration only are considered. For
apply, however these will have generic
changes of use to functions not consistent with
application over the whole of the Shire Business
Table 4.2, the impact assessment process will
centre site.
be followed. Note that the provisions focus on
the principles for each sub-precinct and more
detail on the exact process for all development
will be a necessary consideration of Stage 2 of
the Master Plan and any relevant development
application.
n
a Pla s
s
N o o uture
e F
J C:\Documents and Settings\oludvigsen\Local Settings\Temporary Internet Files\OLK7\Master Plan.doc Th o s ing
o
Ch